Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 01/05/2021 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Approved |
Entered by RSALDAT1 - 09150. Approved. |
| 03/15/2019 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Partial Approval |
Entered by CBELL1 - Left open for details only. I met with Brian at 955-2756 with Indevco construction. The project is R and why enterprises it is less than an acre. There is a single trashing closure however the owner is considering changes, I informed the contractor that any changes will need to be documented in the form of approved plans. I requested track out of control and stormwater follow-up inspections on a regular basis even though there is no SWPPP. I let the contractor know that he’s responsible for keeping the streets clean in the jobsite contained |