Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: DP18-0244

Parcel: 107020100

Inspection Status: Passed

Inspection History: PDSD Engineering Division Pre-Construction SITE

Date Description Inspector Results Comments
01/05/2021 PDSD Engineering Division Pre-Construction SITE BBENEDON Approved Entered by RSALDAT1 - 09150. Approved.
03/15/2019 PDSD Engineering Division Pre-Construction SITE BBENEDON Partial Approval Entered by CBELL1 - Left open for details only. I met with Brian at 955-2756 with Indevco construction. The project is R and why enterprises it is less than an acre. There is a single trashing closure however the owner is considering changes, I informed the contractor that any changes will need to be documented in the form of approved plans. I requested track out of control and stormwater follow-up inspections on a regular basis even though there is no SWPPP. I let the contractor know that he’s responsible for keeping the streets clean in the jobsite contained