Permit: DP18-0244

Parcel: 107020100

Inspection Status: Not Ready

Inspection History: ENGR Grading Final

Date Description Inspector Results Comments
10/27/2022 ENGR Grading Final Not Ready
04/27/2021 ENGR Grading Final BBENEDON Approved Entered by VLEON1 - Approved. Change of dumpster location shall be addressed with final inspections.
03/02/2021 ENGR Grading Final BBENEDON Partial Approval Entered by RSALDAT1 - Partially approved. Final rebar inspection OK. Waiting for plan revision for final approval.
02/18/2021 ENGR Grading Final BBENEDON Partial Approval Entered by RSALDAT1 - Partially approved. Rebar mat for pre-slab Inspection left open pending revision for trash enclosure location.
02/12/2021 ENGR Grading Final BBENEDON Partial Approval Entered by VLEON1 - Partial approval . Pre-grout inspection OK. Rebar inspection to be left in the partial approval state until plan revisions for a change of location have been approved.
02/04/2021 ENGR Grading Final BBENEDON Partial Approval Entered by VLEON1 - PARTIAL APPROVED PRE-GROUT INSPECTION
02/03/2021 ENGR Grading Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - . Not ready. Pre-grout. Joel 405-2226
12/30/2020 ENGR Grading Final BBENEDON Partial Approval Entered by VLEON1 - Partially approved. Rough grading and trash enclosure footing OK pending plan revision prior to final for relocation of trash enclosure.
12/24/2020 ENGR Grading Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - Not ready. Footing has been dug but no rebar has been installed.
07/29/2021 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Project is nearing completion. Plan revision required for change of location of trash enclosure.
11/29/2019 ENGR Grading Final DROBERTS Not ready for Inspection Entered by DMERANZ1 - WORK HAS STARTED, FLOOR SLABS AND FOOTERS HAVE BE POURED PRIOR TO THIS DATE. CONTRACTOR APPEARS TO BE RON’S CONCRETE.
11/10/2021 ENGR Grading Final BBENEDON Approved Entered by VVERA1 - Approved
07/28/2021 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - 09185, 09030. Approved INSPECTOR CHANGED TO CN
07/28/2021 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Paving and striping in progress. Jerry with Sundt.
04/13/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - CONTINUE LANDSCAPING AND STABILIZATION
04/08/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - Continued. Provide water harvesting as specified leaving room for finished ground coverings. Joel 405-2226
02/25/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - Continued. Contractor working in right of way. Has not poured in or around trash enclosure at this time. Time.
02/04/2021 ENGR Grading Final BBENEDON Partial Approval Entered by VLEON1 - PARTIAL APPROVAL TRASH ENCLOSURE WALLS PRE-GROUT
02/03/2021 ENGR Grading Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - . Not ready. Pre-grout. Joel 405-2226
01/07/2021 ENGR Grading Final BBENEDON Partial Approval Entered by VLEON1 - Partially approved. Installing concrete drive.
12/30/2020 ENGR Grading Final BBENEDON Partial Approval Entered by VLEON1 - Partially approved. Rough grading and trash enclosure footing OK pending plan revision prior to final for relocation of trash enclosure.
10/18/2023 ENGR Grading Final Not Ready No plans available