Permit: DP18-0244

Parcel: 107020100

Inspection Status: Complete (Recurring)

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
04/19/2022 ENGR Engineering Final BBENEDON Continued Entered by NGARCIA3 - Continued. Waiting for plan revision for location of trash enclosure.
01/27/2022 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by VVERA1 - Not ready. Unscheduled inspection. Waiting for plan revision for trash enclosure location, completion of landscaping behind trash enclosure. Provide notice of termination for SWPPP permit. Building is vacant at this time. Schedule inspection when ready.
08/27/2021 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by NGARCIA3 - Not ready. Debris pile on vacant lot across the street from project has been removed
08/05/2021 ENGR Engineering Final BBENEDON Continued Entered by RSALDAT1 - . Continued. No changes since last inspection
07/28/2021 ENGR Engineering Final BBENEDON Partial Approval Entered by RSALDAT1 - 09027, 09028. Partially approved. Complete all work. Engineering has no issues it would prevent a temporary certificate of occupancy.
05/05/2021 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by VLEON1 - Not ready. As built drawings have not been sent to Lauren makus as of this time. Email from joe@indevcoarizona.com.
11/09/2021 ENGR Engineering Final BBENEDON Continued Entered by NGARCIA3 - Continued. No change at landscaping behind dumpster area
10/01/2021 ENGR Engineering Final BBENEDON Continued Entered by NGARCIA3 - Continued. No change since last inspection.
07/28/2021 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - Not ready. Stabilize the bare dirt area behind and around trash enclosure. Depress landscaped areas where there is a curb cut. Finish grade shall be below the level of the curb inlet. Properly stake trees. Terminate sewer clean out to prevent rainwater from entering, building south. Provide revision for trash enclosure relocation.
07/15/2021 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - not ready, unscheduled inspection erosion behind enclosure and in over filled island
05/26/2021 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by VLEON1 - Not ready. Joel with Indevco at 405-2226