Inspection Status: Complete (Recurring)
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 04/19/2022 |
ENGR Engineering Final
|
BBENEDON |
Continued |
Entered by NGARCIA3 - Continued. Waiting for plan revision for location of trash enclosure.
|
| 01/27/2022 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by VVERA1 - Not ready. Unscheduled inspection. Waiting for plan revision for trash enclosure location, completion of landscaping behind trash enclosure. Provide notice of termination for SWPPP permit. Building is vacant at this time. Schedule inspection when ready. |
| 08/27/2021 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by NGARCIA3 - Not ready. Debris pile on vacant lot across the street from project has been removed |
| 08/05/2021 |
ENGR Engineering Final
|
BBENEDON |
Continued |
Entered by RSALDAT1 - . Continued. No changes since last inspection
|
| 07/28/2021 |
ENGR Engineering Final
|
BBENEDON |
Partial Approval |
Entered by RSALDAT1 - 09027, 09028. Partially approved. Complete all work. Engineering has no issues it would prevent a temporary certificate of occupancy.
|
| 05/05/2021 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by VLEON1 - Not ready. As built drawings have not been sent to Lauren makus as of this time. Email from joe@indevcoarizona.com.
|
| 11/09/2021 |
ENGR Engineering Final
|
BBENEDON |
Continued |
Entered by NGARCIA3 - Continued. No change at landscaping behind dumpster area |
| 10/01/2021 |
ENGR Engineering Final
|
BBENEDON |
Continued |
Entered by NGARCIA3 - Continued. No change since last inspection. |
| 07/28/2021 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by RSALDAT1 - Not ready. Stabilize the bare dirt area behind and around trash enclosure. Depress landscaped areas where there is a curb cut. Finish grade shall be below the level of the curb inlet. Properly stake trees. Terminate sewer clean out to prevent rainwater from entering, building south. Provide revision for trash enclosure relocation.
|
| 07/15/2021 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by RSALDAT1 - not ready, unscheduled inspection erosion behind enclosure and in over filled island
|
| 05/26/2021 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by VLEON1 - Not ready. Joel with Indevco at 405-2226
|