Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 05/21/2020 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Approved |
Entered by RSALDAT1 - |
| 03/18/2019 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Partial Approval |
Entered by CBELL1 - Contractor has been asked to schedule stormwater follow-up inspections every two weeks |
| 02/13/2019 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Partial Approval |
Entered by CBELL1 - |
| 02/13/2019 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Partial Approval |
Entered by CBELL1 - I met with Bryan from desert earth, 307-4459. He will be responsible for the grading, paving, drainage and track out protection, which is not yet been installed. AF sterling will provide and comply with the SWIPP requirements and will reschedule this inspection and Stormwater controls inspection. Provide signage and stormwater controls, and schedule stormwater follow-up inspections on a biweekly basis. |