Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 08/27/2020 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 08/27/2020 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 09/22/2020 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 06/15/2020 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued. Four homes and all common areas have sidewalks at this time. |
| 12/03/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by DMERANZ1 - Contractor is starting the fourth home. Has installed curbs and pavement. Inspector on site for a basin inspection. |
| 06/13/2019 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 05/02/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by CBELL1 - Contractor installing electric utilities preparing for backfill. |
| 03/26/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by CBELL1 - Contractor had started site sewer work. Sewer has been installed through the right of way and stabbed into property at this time |
| 02/22/2019 |
ENGR Grading Final |
bbenedo1 |
Continued |
Entered by BBENEDO1 - Contractor has cleared site and has started grading. There is no activity today due to weather. Controls have not yet been installed. |
| 10/13/2020 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - ROB WILL SENDING THE N.O.T. AND KEN PERRY WILL SEND HIS CERT. LETTER |
| 08/27/2020 |
ENGR Grading Final |
DROBERTS |
Partial Approval |
Entered by JSCHNEI2 - SEE THE COMMENTS POSTED IN PERMITS PLUS FOR THIS ITEM. |
| 08/27/2020 |
ENGR Grading Final |
DROBERTS |
Correction Required |
Entered by DROBERT5 - THIS SITE HAS BEEN CHECKED AND THE FOLLOWING ARE SOME OF THE ITEMS THAT HAVE BEEN NOTED AS IN COMPLETE.
SIDEWALKS NEED TO BE COMPLETED AS SHOWN ON THE APPROVED PLANS, CURRENTLY THERE ARE 5 HOUSES THAT HAVE NOT BEEN COMPLETED ON THIS DATE.
REMOVE ALL REMAINING CONSTRUCTION TRASH, DREBIS, AND EXCESS MATERIAL FROM THE SITE. THIS WILL ALSO INCLUDE ANY MATERIAL THAT IS FOUND WITHIN THE COMMON AREAS AND THE SURROUNDING PERIMETER.
REMOVE ALL SEDIMENT, COMSTRUCTION MATERIAL, AND TRASH FROM WITHIN THE BASIN, DRAINAGE WAY, AND WEIR OUTLET AREA. cONCRETE WASHOUT HAS BEEN NOTED AT VARIOUS LOCATIONS THROUGHOUT THE SITE.
PROVIDE A MONITORING REPORT FROM WILDER LANDSCAPE ARCHITECTS FOR ACCEPTANCE OF THE PLANTINGS THAT HAVE BEEN COMPLETED. INSTALL ALL MISSING OR DEAD PLANATS TO THIS SITE PRIOR TO REQUESTING ANOTHER FINAL INSPECTION. VERIFY THAT ALL OF THE PLANTS ARE PL;ANTED IN THE AREAS AS SHOWN ON THE APPROVED PLANS AND PROVIDE DOCUMENTATION FOR ALL CHANGES THAT HAVE BEEN MADE AND APPROVED.tHERE ARE MISSING TREES NOTED IN THE BASIN LOCATED AT THE NORTH WEST CORNER OF THE IS SITE, AND THERE MAY BE SOME MSSING ALONG TUCSON BLVD AND AT THE ENTRY GATE INTO THEIS SITE.
PROVIDE US WITH A COPY OF THE N.O.T (NOTICE OF TERMINATION) DOCUMENTATION FROM ARIZONA DEPARTMENT OF ENVIRONMETAL QUALITY, A COPY OF THE REVISED DRAWINGS FOR ALL THE CHANGES THAT HAVE BEEN MADE TO THIS SITE, AND A CERTIFICATION LETTER FOR THE ENGINEEROF RECORC FOR THIS SITE.
A REINSPECTION OF THE SITE WILL BE REQUIRED TO THE FULL RELEASE AND CLOSURE OF ALL PERMITS. |
| 12/03/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by DMERANZ1 - Contractor is starting the fourth home. Has installed curbs and pavement. Inspector on site for a basin inspection. |
| 10/31/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by DMERANZ1 - There are two houses currently in progress. Retaining walls are being installed |
| 07/11/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by DMERANZ1 - Contractor installing corner curbs, and riprap as shown per Delta one revision.
|
| 06/13/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by DMERANZ1 - The site has been paved and curbs have been installed. The first house pad is under construction Brian with desert earth 307-4459 |
| 05/02/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by CBELL1 - Contractor installing electric utilities preparing for backfill. |
| 04/22/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by CBELL1 - Desert earth is installing electrical services in public water. Tucson water inspector is on site |
| 04/04/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by CBELL1 - Desert Earth on site, until 2:30 PM. Contractor has completed site sewer work and will begin waterline work tomorrow. |
| 03/26/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by CBELL1 - Desert earth has started site utility work |
| 03/18/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by CBELL1 - Only activity on the site is the well removal in progress |
| 03/14/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by CBELL1 - FOR 3641:
Contractor has started Preliminary grading and has created a nursery for native plants on the east side of the property. |