Inspection Status: Not Ready
Inspection History: SITE - Stormwater Final Inspection
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
SITE - Stormwater Final Inspection |
|
Not Ready |
|
| 10/28/2020 |
SITE - Stormwater Final Inspection |
BBENEDON |
Not ready for Inspection |
Entered by PAHUMAD1 - Not ready. Construction still in progress. Abandon controls in various places. |
| 09/14/2020 |
SITE - Stormwater Final Inspection |
BBENEDON |
Not ready for Inspection |
Entered by JSCHNEI2 - Not ready. Abandon stormwater controls and other construction debris’s need to be removed from site perimeter |
| 08/25/2020 |
SITE - Stormwater Final Inspection |
DROBERTS |
Not ready for Inspection |
Entered by JSCHNEI2 - NOT READY AT THIS TIME, FINAL NOT TO BE SCHEDULED TILL THE ISSUANCE OF THE NOTICE OF TERMINATION HAS BEEN ISSUED TO YOU BY ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY. |
| 08/13/2020 |
SITE - Stormwater Final Inspection |
BBENEDON |
Not ready for Inspection |
Entered by JSCHNEI2 - Not ready. Note there are a Bandan stormwater controls along the north perimeter of the site that need to be cleaned/removed prior to final inspection. Additionally all construction debris shall be removed from the area.
|