Inspection History Details
Inspection Status: Not Ready
Inspection History: SITE - Stormwater Final Inspection
Permit Number - DP18-0212
Inspection Description - SITE - Stormwater Final Inspection
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | SITE - Stormwater Final Inspection | Not Ready | ||
10/28/2020 | SITE - Stormwater Final Inspection | BBENEDON | Not ready for Inspection | Entered by PAHUMAD1 - Not ready. Construction still in progress. Abandon controls in various places. |
09/14/2020 | SITE - Stormwater Final Inspection | BBENEDON | Not ready for Inspection | Entered by JSCHNEI2 - Not ready. Abandon stormwater controls and other construction debris’s need to be removed from site perimeter |
08/25/2020 | SITE - Stormwater Final Inspection | DROBERTS | Not ready for Inspection | Entered by JSCHNEI2 - NOT READY AT THIS TIME, FINAL NOT TO BE SCHEDULED TILL THE ISSUANCE OF THE NOTICE OF TERMINATION HAS BEEN ISSUED TO YOU BY ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY. |
08/13/2020 | SITE - Stormwater Final Inspection | BBENEDON | Not ready for Inspection | Entered by JSCHNEI2 - Not ready. Note there are a Bandan stormwater controls along the north perimeter of the site that need to be cleaned/removed prior to final inspection. Additionally all construction debris shall be removed from the area. |