Permit: DP18-0212

Parcel: 14026003Q


Addresses:

5975 S TUCSON BL


Inspection Status: Not Ready

Inspection History: SITE - Stormwater Final Inspection

Permit Number - DP18-0212

Inspection Description - SITE - Stormwater Final Inspection

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/26/2022 SITE - Stormwater Final Inspection Not Ready
10/28/2020 SITE - Stormwater Final Inspection BBENEDON Not ready for Inspection Entered by PAHUMAD1 - Not ready. Construction still in progress. Abandon controls in various places.
09/14/2020 SITE - Stormwater Final Inspection BBENEDON Not ready for Inspection Entered by JSCHNEI2 - Not ready. Abandon stormwater controls and other construction debris’s need to be removed from site perimeter
08/25/2020 SITE - Stormwater Final Inspection DROBERTS Not ready for Inspection Entered by JSCHNEI2 - NOT READY AT THIS TIME, FINAL NOT TO BE SCHEDULED TILL THE ISSUANCE OF THE NOTICE OF TERMINATION HAS BEEN ISSUED TO YOU BY ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY.
08/13/2020 SITE - Stormwater Final Inspection BBENEDON Not ready for Inspection Entered by JSCHNEI2 - Not ready. Note there are a Bandan stormwater controls along the north perimeter of the site that need to be cleaned/removed prior to final inspection. Additionally all construction debris shall be removed from the area.