Permit: DP18-0212

Parcel: 14026003Q


Addresses:

5975 S TUCSON BL


Inspection Status: Complete (Recurring)

Inspection History: SITE - Stormwater Follow-up

Permit Number - DP18-0212

Inspection Description - SITE - Stormwater Follow-up

Inspection Status - Complete (Recurring)

Date Description Inspector Results Comments
10/28/2020 SITE - Stormwater Follow-up BBENEDON Continued Entered by RSALDAT1 - Continued. No issues. Track out is contained to the site. Concrete containment in place.
09/29/2020 SITE - Stormwater Follow-up BBENEDON Continued Entered by JSCHNEI2 - Continued. New concrete washout area has been established northwest corner. Old washout area has construction debris still present
08/25/2020 SITE - Stormwater Follow-up DROBERTS Continued Entered by JSCHNEI2 - NO CONCERNS AT THIS TIME FOR ALL STORMWATER ITEMS, ALL ARE FUNCTIONING AS PLANNED
08/13/2020 SITE - Stormwater Follow-up BBENEDON Continued Entered by JSCHNEI2 - Continued. No issues. Controls are in place
06/15/2020 SITE - Stormwater Follow-up BBENEDON Continued Entered by RSALDAT1 - Continued. No issues at this time
06/09/2020 SITE - Stormwater Follow-up BBENEDON Continued Entered by RSALDAT1 - Continue. No issues at this time. Concrete containment has been corrected. Dirt ramps have been removed from Bilby Road
05/14/2020 SITE - Stormwater Follow-up BBENEDON Continued Entered by RSALDAT1 -
05/04/2020 SITE - Stormwater Follow-up BBENEDON Continued Entered by RSALDAT1 - No issues at this time
04/23/2020 SITE - Stormwater Follow-up BBENEDON Continued Entered by RSALDAT1 - No issues.
03/25/2020 SITE - Stormwater Follow-up BBENEDON Continued Entered by SFLORES2 - Concrete washout area is full and concrete is being dumped onto the ground. Please clean/remove all discarded concrete and provide any washout area as required
03/19/2020 SITE - Stormwater Follow-up BBENEDON Continued Entered by SFLORES2 - No issues at this time.
02/28/2020 SITE - Stormwater Follow-up BBENEDON Continued Entered by DMERANZ1 -
02/10/2020 SITE - Stormwater Follow-up BBENEDON Continued Entered by DMERANZ1 - There are no issues at this time. The temporary dirt ramp has been removed. The roads have been paved.
01/24/2020 SITE - Stormwater Follow-up BBENEDON Continued Entered by DMERANZ1 - Minor track out and dirt ramps on Bilby.
01/17/2020 SITE - Stormwater Follow-up BBENEDON Continued Entered by DMERANZ1 - There is still dirt on Bilby Road that needs to be removed.
12/18/2019 SITE - Stormwater Follow-up BBENEDON Continued Entered by DMERANZ1 - Contractor has installed a new entrance using dirt as a ramp over the curb. This is not acceptable. Please remove all dirt from the street.
11/21/2019 SITE - Stormwater Follow-up BBENEDON Continued Entered by DMERANZ1 - Correct dirt Ramp at site entrance
11/21/2019 SITE - Stormwater Follow-up BBENEDON Continued Entered by DMERANZ1 - Controls are in place there was no track out, however the dirt ramp onto the site needs to be corrected
10/29/2019 SITE - Stormwater Follow-up BBENEDON Continued Entered by DMERANZ1 - Bob with Eaglerock will let DR Horton know that stormwater protections are necessary. DR Horton is responsible for the SWPPP.
10/25/2019 SITE - Stormwater Follow-up BBENEDON Continued Entered by DMERANZ1 - There is trackout and rocks in the street, and the protections corrected.
10/09/2019 SITE - Stormwater Follow-up BBENEDON Continued Entered by DMERANZ1 - No Issues
09/11/2019 SITE - Stormwater Follow-up BBENEDON Continued Entered by DMERANZ1 - There are no issues at this time. Contractor needs to schedule this inspection on a regular basis as requested at preconstruction meeting