Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: DP18-0201

Parcel: 113040380


Addresses:

3401 N FREMONT AV

Inspection Status: Not Ready

Inspection History: ENGR Grading Final

Date Description Inspector Results Comments
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
04/21/2022 ENGR Grading Final BBENEDON Partial Approval Entered by NGARCIA3 - Partially approved
05/14/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - Continued. Construction in progress. Paving, curbs etc.
03/12/2021 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Bryan with Desert earth contractors. Do not call Tracy
10/30/2020 ENGR Grading Final BBENEDON Continued Entered by PAHUMAD1 - Continued. Work in right of way. Sewer connection
09/22/2020 ENGR Grading Final BBENEDON Continued Entered by JSCHNEI2 - Continued. Contractors in the process of clearing site.
06/09/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. The Fremont gate is locked. Enter from Kleindale off of Mountain
03/12/2020 ENGR Grading Final BBENEDON Continued Entered by SFLORES2 - Contractor has started to grub and clear and has started a nursery of native plants.
07/15/2022 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. Rough grading at interior basins.
06/22/2022 ENGR Grading Final BBENEDON Continued Entered by VVERA1 - Continued. Building construction ongoing
05/19/2022 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continue. Building progress
04/26/2022 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued
03/22/2022 ENGR Grading Final DROBERTS Partial Approval Entered by RSALDAT1 - PARTIAL, CREWS WORKING ON CLEANUP OF THE SITE, BUT IT IS NOT COMPLETE AT THIS TIME.
03/17/2022 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. Building construction in progress. Basins have been rough cut. Landscaping in progress in common areas.
03/10/2022 ENGR Grading Final DROBERTS Correction Required Entered by DROBERT5 - SITE INSPECTION PERFORMED ON THIS DATE AND THE FOLLOWING DEFICIENCIES WERE NOTED: 1) THE STUCCO CONTRACTOR IS IN VIOLATION OF THE SWPPP, SITE PREPARATION FOR THE HOME IS NOT PREVENTING THE DEPOSIT OF STUCCO/CONCRETE ONTO THE SURROUNDING GROUND DURING THEIR PROCESS. PLASTIC OR TARPS SHOULD BE UTILIZED IF POSSIBLE OVER THE GROUND PRIOR TO THE PLACEMENT OF THE SCAFFOLDS, THIS WILL HELP PREVENT THE CONTAMINATION. GENERAL SITE MAINTENANCE BEFORE AND AFTER THE PLACEMENT OF THE STUCCO TO ENSURE THAT THE CONCRETE MATERIAL IS NOT REACHING THE RETENTION/DETENTION BASINS. 2) THE BASIN LOCATED IN THE NORTHWEST CORNER OF THE SITE IS BEING UTILIZED FOR THE WASHOUT OF CONCRETE FROM EITHER LOCAL EQUIPMENT OR FROM THE CONCRETE TRUCKS, THIS VIOLATION NEEDS TO STOP AT THIS TIME. 3) THE BASIN "C" IS BEING UTILIZED AT THIS TIME AS A WASHOUT AREA FOR THE CONCRETE TRUCKS AND OTHERS, PHOTOS HAVE BEEN TAKEN ON THIS DATE. THIS VIOLATION NEEDS TO STOP IMEDIATELY OR THIS ACTION WILL HAVE TO BE REPORTED TO THE ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY. REMOVE ALL CONCRETE MATERIAL AND SOIL FROM THIS BASIN AND CALL FOR AN INSPECTION BEFORE THIS SITE IS COVER. FAILURE TO DO SO WILL RESULT IN THE RMOVAL OF ANY AND ALL MATERIAL SO THAT A FORMAL INSPECTION CAN BE PERFORMED OF THE AREA. 4) THE WASHOUT LOCATION AT THE NORTHEAST CONRNER OF THE SITE HAS THE FOLLOWING ITEMS WRONG WITH IT AT THIS TIME. THE WASHOUT AREAS NEEDS TO BE MAINTAINED AS NEEDED THROUGHOUT THE DURATION OF THE SITE. REMOVE AND REPLACE THE LINING OF THE WASHOUT AREA TO PREVENT CONTAMINATION OF THE SOILS BELOW THE PIT. CLEAN UP ALL CONCRETE SPOILS, TRASH, AND DEBRIS THE HAVE BEEN DEPOSITED ON THE EXTERIOR OF THE PIT. 5) GENERAL SITE CLEANUP OF ALL CONSTRUCTION TRASH AND DEBRIS, CONCRETE SPOILS. CONCRETE AND PAINT WASHOUT LOCATIONS SHOULD BE AT ANY LOCATION THAT IS NEEDED, THIS MATERIAL SHOULD NOT BE DEPOSITED DIRECTLY ONTO OPEN SOILS. THIS SITE WILL BE CHECK WITHIN THE NEXT 2 WEEKS TO VERIFY THAT THIS WORK IS HAPPENING, FAILURE TO DO SO WILL RESULT IN THE REPORTING OF THIS SITE.
12/21/2021 ENGR Grading Final DROBERTS Continued Entered by RSALDAT1 - CONTINUED AT THIS TIME, MOST WORK ONSITE IS VERTICAL, MINOR SITE WORK.
12/10/2021 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Building construction in progress no site work at this time
11/15/2021 ENGR Grading Final DROBERTS Continued Entered by VVERA1 - IS CONTINUED, LOOKED OVER THE PLANS WITH BRIAN FROM DESERT EARTH TO SEE SOME OF THE ISSUES THAT WE ARE FACING WITH SIDEWALKS, PATHWAY, AND CURB ACCESS RAMPS. I WILL BE HIGHLIGHTING THE PLANS AND SEND IT TOO KEVIN HALL TO MAKE THE NECESSARY CHANGES SO THE CONTRACTOR CAN CONSTRUCT. THE ROADWAYS ARE DIRT AT THIS TIME, CREWS ARE WORKING ON INSTALLING THE CONCRETE SIDEWALKS AS NEEDED, POURING CURBS AS NEEDED. MOST OF THE WORK ON THIS SITE IS VERTICAL BUILDING CONSTRUCTION.
11/09/2021 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Access to model home
11/04/2021 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Bryan with desert earth. No new site work activity at this time. Residential building construction in progress.
09/02/2021 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. Rough cut retention basins are holding water more than 24 hours since last rain.
08/31/2021 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continue. Building construction in full swing. KB homes Mt. enclave
08/18/2021 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Concrete and asphalt and material piles on site. Lots and basins have been rough graded. Basins retaining water after recent rain events
08/04/2021 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Basin retaining water. Desert earth on site
08/03/2021 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Basins have been rough cut, basins are retaining water with recent storm activity. Large material stock piles on site. Building construction in progress. Concrete parking slab installed at model. No striping or signage at this time. Recall for inspection when accessible Space and access has been completed.
07/08/2021 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Utility work on far west side of Site, Two buildings under construction
07/07/2021 ENGR Grading Final BBENEDON Partial Approval Entered by RSALDAT1 - Partially approved. Paving, southern portion.
06/23/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 -
06/23/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - Continued. Utility work in progress. Work within the right of way on Halcyon.
06/04/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - Continued. Basin, rough graded Northwest portion of sight. Paving west half of sight. First building under construction
05/19/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - CONTINUE ON GOING
04/30/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - CONTINUE FINAL GRADING, CURBS AND PAVING IN PROGRESS
03/17/2021 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Grading and utility work
02/05/2021 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Site utility installation in progress. Bryan w/ Desert earth
01/28/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - CONTINUE SITE UTILITY WORK IN PROGRESS. DESERT EARTH, KB HOMES MOUNTAIN ENCLAVE
11/02/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Site sewer work in progress.
10/21/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Rough grading.
09/22/2020 ENGR Grading Final BBENEDON Continued Entered by JSCHNEI2 - Continued. Still clearing site.
08/20/2020 ENGR Grading Final BBENEDON Continued Entered by JSCHNEI2 - Continued
05/18/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. No activity on site at this time
04/04/2023 ENGR Grading Final Not Ready Complete all work as shown on the approved plans prior to calling this in for a final Inspection
04/04/2023 ENGR Grading Final Partial Pass Complete all work as shown on the approved plans prior to calling this in for a final Inspection
04/07/2023 ENGR Grading Final Partial Pass Complete all works as shown on the approved plans for this project prior to calling this in for a final. This will include all the discussed work that was noted during today’s site, inspection drainage, Waze being cut and complete drainage way underground being installed and the drainage box being locked up with concrete, and finally the grading of the detention basin K as noted on the approved plans to allow for proper drainage of all the Rainwater.
04/07/2023 ENGR Grading Final Partial Pass Complete all works as shown on the approved plans for this project prior to calling this in for a final. This will include all the discussed work that was noted during today’s site, inspection drainage, Waze being cut and complete drainage way underground being installed and the drainage box being locked up with concrete, and finally the grading of the detention basin K as noted on the approved plans to allow for proper drainage of all the Rainwater.
05/04/2023 ENGR Grading Final Partial Pass Beat the sidewalk replacement, and then can recall this inspection in for a final
05/04/2023 ENGR Grading Final Passed N/A
11/15/2022 ENGR Grading Final Complete (Recurring) Not ready