Permit: DP18-0201

Parcel: 113040380


Addresses:

3401 N FREMONT AV

Inspection Status: Not Ready

Inspection History: SITE - Stormwater Follow-up

Date Description Inspector Results Comments
10/26/2022 SITE - Stormwater Follow-up Not Ready
09/26/2022 SITE - Stormwater Follow-up DROBERTS Partial Approval Entered by NGARCIA3 - IS PARTIAL, NO CONCERNS AT THIS TIME
09/02/2022 SITE - Stormwater Follow-up BBENEDON Correction Required Entered by RSALDAT1 - . Correction required. Please provide concrete containment in all locations as needed. Thoroughly remove all concrete in dirt areas.
08/05/2022 SITE - Stormwater Follow-up BBENEDON Continued Entered by NGARCIA3 - Continued
07/15/2022 SITE - Stormwater Follow-up BBENEDON Continued Entered by NGARCIA3 - Continued. Concrete containment and basin area protection in place.
06/10/2022 SITE - Stormwater Follow-up BBENEDON Continued Entered by VVERA1 - Continued
06/03/2022 SITE - Stormwater Follow-up BBENEDON Continued Entered by NGARCIA3 - Continued. Concrete containment requires correction.
05/24/2022 SITE - Stormwater Follow-up BBENEDON Continued Entered by NGARCIA3 - Continued. All material piles contained within site
05/02/2022 SITE - Stormwater Follow-up MHERNANDEZ Continued Entered by VVERA1 - CN / NO CONCERNS AT IS TIME.
04/21/2022 SITE - Stormwater Follow-up BBENEDON Continued Entered by NGARCIA3 - Continued. Concrete containment is still an issue
04/12/2022 SITE - Stormwater Follow-up BBENEDON Continued Entered by NGARCIA3 - Continued. All materials are contained within site.
03/24/2022 SITE - Stormwater Follow-up MHERNANDEZ Continued Entered by VVERA1 - CN/NO CONCERNS AT THIS TIME GOD.
03/09/2022 SITE - Stormwater Follow-up BBENEDON Continued Entered by RSALDAT1 - Continued.
02/01/2022 SITE - Stormwater Follow-up BBENEDON Continued Entered by RSALDAT1 - Continue
01/14/2022 SITE - Stormwater Follow-up DROBERTS Continued Entered by NGARCIA3 - CONTINUED, NO CONCERNS AT THIS TIME, CREWS WORKING ON THE NORTH ROADWAY INTO THE SITE.
12/21/2021 SITE - Stormwater Follow-up DROBERTS Continued Entered by RSALDAT1 - CONTINUED, NO CONCERNS ATTHIS TIME
12/10/2021 SITE - Stormwater Follow-up BBENEDON Continued Entered by RSALDAT1 - Continued. No issues after last rain event
11/15/2021 SITE - Stormwater Follow-up DROBERTS Continued Entered by VVERA1 - IS CONTINUED AT THIS TIME MINOR TRACK OUT NOTED ON ADJACENT STREETS, HAVE ASKED THE CREWS TO MAKE THE NECESSARY CORRECTIONS.
10/21/2021 SITE - Stormwater Follow-up BBENEDON Continued Entered by NGARCIA3 - Continued. No issues at this time. 3401 N Fremont Ave,
08/17/2021 SITE - Stormwater Follow-up BBENEDON Continued Entered by RSALDAT1 - Continued. No issues at this time
08/03/2021 SITE - Stormwater Follow-up BBENEDON Continued Entered by RSALDAT1 - Continued. Minor track out noted at Southern and west entrance is. Clean up in progress.
07/28/2021 SITE - Stormwater Follow-up BBENEDON Continued Entered by VLEON1 - Continued. Track out at unprotected west entrance on Haloway Street. Desert earth on site. Building construction in progress. Basins have minimal amount of standing water after last rain event.
05/03/2021 SITE - Stormwater Follow-up DROBERTS Continued Entered by DROBERT5 - NO CONCERNS AT THIS TIME
04/30/2021 SITE - Stormwater Follow-up BBENEDON Continued Entered by VLEON1 - CONTINUE TRACK OUT PRESENT
03/17/2021 SITE - Stormwater Follow-up BBENEDON Continued Entered by RSALDAT1 - Continued. There is no notable track out at this time.
03/12/2021 SITE - Stormwater Follow-up BBENEDON Continued Entered by RSALDAT1 - Continued. Bryan with Desert earth contractors. Do not call Tracy
03/02/2021 SITE - Stormwater Follow-up BBENEDON Continued Entered by VLEON1 - CONTINUE BRYAN WITH DESERT EARTH
02/05/2021 SITE - Stormwater Follow-up BBENEDON Continued Entered by RSALDAT1 - Continued. Craig with KB homes and Bryan with desert earth.
02/04/2021 SITE - Stormwater Follow-up BBENEDON Continued Entered by VLEON1 - Continued. Conversation with Craig from KB homes. Regarding rocks on Halcyon and regular scheduled inspections.
01/28/2021 SITE - Stormwater Follow-up BBENEDON Continued Entered by VLEON1 - CONTINUE CORRECTION REQUEST EXCESSIVE ROCK AND MUD IN HALCYON ROAD. SWPP CONTACT LANCE OSBORNE 9752730. LEFT VOICE MESSAGE ASKING FOR CORRECTION
01/28/2021 SITE - Stormwater Follow-up BBENEDON Continued Entered by VLEON1 - CONTINUE - THERE IS NO TRACK OUT, HOWEVER THERE IS MINOR DIRT ACCUMULATION ALONG CURB
11/02/2020 SITE - Stormwater Follow-up BBENEDON Continued Entered by RSALDAT1 - Continued. Minor track out
09/22/2020 SITE - Stormwater Follow-up BBENEDON Continued Entered by JSCHNEI2 - Continued. No issues at this time
09/11/2020 SITE - Stormwater Follow-up BBENEDON Continued Entered by JSCHNEI2 - Continued
08/20/2020 SITE - Stormwater Follow-up BBENEDON Continued Entered by JSCHNEI2 - Continued. No issues at this time. Site has been cleared but there is no activity in progress. No controls.
07/27/2020 SITE - Stormwater Follow-up DROBERTS Continued Entered by RSALDAT1 - IS CONTINUED AT THIS TIME. I CONTACTED THE CONTRACTOR, THEY ARE NOT CURRENTLY WORKING ON THIS SITE. THEY WILL BE CONSTRUCTING THE EXTERIOR WALLS IN THE FUTURE PRIOR TO WORKING ON THE BUILDINGS. THEREARE NO CONCERNS IN REGARDS TO THIS INSPECTION.
06/02/2020 SITE - Stormwater Follow-up BBENEDON Continued Entered by RSALDAT1 - Continued. There are no issues at this time
05/18/2020 SITE - Stormwater Follow-up BBENEDON Continued Entered by RSALDAT1 - Continued. No activity on site at this time
05/06/2020 SITE - Stormwater Follow-up BBENEDON Continued Entered by RSALDAT1 - No issues. No activity at this time
03/20/2020 SITE - Stormwater Follow-up BBENEDON Continued Entered by SFLORES2 - No concerns at this time.
02/28/2020 SITE - Stormwater Follow-up BBENEDON Continued Entered by DMERANZ1 - No issues at this time
04/04/2023 SITE - Stormwater Follow-up Complete (Recurring) No concerns at this time
04/07/2023 SITE - Stormwater Follow-up Passed N/A