Permit: DP18-0195

Parcel: 123020860


Addresses:

2502 E GRANT RD


Inspection Status: Passed

Inspection History: ENGR Grading Final

Permit Number - DP18-0195

Inspection Description - ENGR Grading Final

Inspection Status - Passed

Date Description Inspector Results Comments
02/07/2020 ENGR Grading Final BBENEDON Approved Entered by DMERANZ1 -
01/14/2020 ENGR Grading Final BBENEDON Partial Approval Entered by DMERANZ1 - Subgrade is ready for asphalt. Accessible route from the north has been installed. Contractors doing work within the right of way.
12/20/2019 ENGR Grading Final BBENEDON Continued Entered by VFLORES1 - Contractor working on north entrance, and is utilizing the west entrance for construction purposes.
12/13/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Installing curbs on west side entrance.
10/18/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Contractor is backfilling around grease interceptors
10/03/2019 ENGR Grading Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - Site is locked up, at 2:30 PM. Unable to do inspection
08/28/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Desert earth is excavating southwest corner
07/16/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Contractor is installing building footings.
02/07/2020 ENGR Grading Final BBENEDON Approved Entered by DMERANZ1 -
09/23/2019 ENGR Grading Final BBENEDON Continued Entered by VFLORES1 - Jobsite Perimeter fencing it’s locked, 2:25 PM.
08/28/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Communications tower workers on site.All other Construction shut down for the day.
07/16/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Division two is building a shell.
07/11/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - I stop by the site Unscheduled at 2 PM however the site is locked for the day. There is grading activity and dirt piles, a job trailer and a division 2 sign with the address posted.
02/26/2020 ENGR Grading Final BBENEDON Approved Entered by SFLORES2 -
12/17/2019 ENGR Grading Final BBENEDON Approved Entered by DMERANZ1 - Trash enclosure installed per approved plans.
12/13/2019 ENGR Grading Final BBENEDON Partial Approval Entered by DMERANZ1 - Pre-grout at trash enclosure.
11/15/2019 ENGR Grading Final BBENEDON Partial Approval Entered by DMERANZ1 - Trash enclosure footings.