Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 02/07/2020 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 01/14/2020 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by DMERANZ1 - Subgrade is ready for asphalt. Accessible route from the north has been installed. Contractors doing work within the right of way. |
| 12/20/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by VFLORES1 - Contractor working on north entrance, and is utilizing the west entrance for construction purposes.
|
| 12/13/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by DMERANZ1 - Installing curbs on west side entrance. |
| 10/18/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by DMERANZ1 - Contractor is backfilling around grease interceptors |
| 10/03/2019 |
ENGR Grading Final |
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Site is locked up, at 2:30 PM.
Unable to do inspection
|
| 08/28/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by DMERANZ1 - Desert earth is excavating southwest corner |
| 07/16/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by DMERANZ1 - Contractor is installing building footings. |
| 02/07/2020 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 09/23/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by VFLORES1 - Jobsite Perimeter fencing it’s locked, 2:25 PM. |
| 08/28/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by DMERANZ1 - Communications tower workers on site.All other Construction shut down for the day. |
| 07/16/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by DMERANZ1 - Division two is building a shell. |
| 07/11/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by DMERANZ1 - I stop by the site Unscheduled at 2 PM however the site is locked for the day. There is grading activity and dirt piles, a job trailer and a division 2 sign with the address posted. |
| 02/26/2020 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by SFLORES2 - |
| 12/17/2019 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by DMERANZ1 - Trash enclosure installed per approved plans. |
| 12/13/2019 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by DMERANZ1 - Pre-grout at trash enclosure. |
| 11/15/2019 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by DMERANZ1 - Trash enclosure footings. |