Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP18-0195

Parcel: 123020860


Addresses:

2502 E GRANT RD


Inspection Status: Passed

Inspection History: ENGR Engineering Final

Permit Number - DP18-0195

Inspection Description - ENGR Engineering Final

Inspection Status - Passed

Date Description Inspector Results Comments
02/26/2020 ENGR Engineering Final BBENEDON Approved Entered by SFLORES2 -
02/20/2020 ENGR Engineering Final RLEDONNE Partial Approval Entered by DMERANZ1 - OK forTCO only. Complete all work on approved plans. Provide COT approved revisions for all changes to approved plans before calling for final. Complete all notes from last Inspection.
02/18/2020 ENGR Engineering Final DROBERTS Not ready for Inspection Entered by DMERANZ1 - COMPLETE ALL WORK AS SHOWN ON THE APPROVED PLANS. THIS WILL INCLUDE THE REMOVAL OF EXCESS DECOMPOSED GRANIT, TRASH DUMPSTERS(ROLLOFF), ALL WORK ADJACENT TO THE NEW BUILDING FOR ALL TI’S.
02/07/2020 ENGR Engineering Final BBENEDON Partial Approval Entered by DMERANZ1 - Depress landscaped areas as shown on water harvesting plan. Landscaping shall be lower than the riprap at curb openings and rainwater drains. Complete ground coverings of exposed areas. Install bicycle parking.
02/26/2020 ENGR Engineering Final BBENEDON Approved Entered by SFLORES2 -
02/20/2020 ENGR Engineering Final RLEDONNE Partial Approval Entered by DMERANZ1 - OK forTCO only. Complete all work on approved plans. Provide COT approved revisions for all changes to approved plans before calling for final. Complete all notes from last Inspection.
02/18/2020 ENGR Engineering Final DROBERTS Not ready for Inspection Entered by DMERANZ1 - COMPLETE ALL WORK AS SHOWN ON THE APPROVED PLANS. THIS WILL INCLUDE THE REMOVAL OF EXCESS DECOMPOSED GRANIT, TRASH DUMPSTERS(ROLLOFF), ALL WORK ADJACENT TO THE NEW BUILDING FOR ALL TI’S.
02/07/2020 ENGR Engineering Final BBENEDON Partial Approval Entered by DMERANZ1 - Depress landscaped areas as shown on water harvesting plan. Landscaping shall be lower than the riprap at curb openings and rainwater drains. Complete ground coverings of exposed areas. Install bicycle parking.