Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: DP18-0183

Parcel: 11106157A

Inspection Status: Not Ready

Inspection History: PDSD Engineering Division Pre-Construction SITE

Date Description Inspector Results Comments
10/26/2022 PDSD Engineering Division Pre-Construction SITE Not Ready
04/05/2022 PDSD Engineering Division Pre-Construction SITE BBENEDON Not ready for Inspection Entered by NGARCIA3 - not ready. Dan with Castle construction at 260-2728. Provide documentation as discussed for trash enclosure rebar. Correct all accessible walkways that exceed 2% cross slope
05/31/2019 PDSD Engineering Division Pre-Construction SITE DROBERTS Approved Entered by DMERANZ1 -
04/11/2023 PDSD Engineering Division Pre-Construction SITE Not Ready There has been no change since the last inspection. Construction has halted.
10/03/2023 PDSD Engineering Division Pre-Construction SITE Passed project complete and occupied