Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not Ready
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
PDSD Engineering Division Pre-Construction SITE |
|
Not Ready |
|
| 04/05/2022 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Not ready for Inspection |
Entered by NGARCIA3 - not ready. Dan with Castle construction at 260-2728.
Provide documentation as discussed for trash enclosure rebar. Correct all accessible walkways that exceed 2% cross slope |
| 05/31/2019 |
PDSD Engineering Division Pre-Construction SITE |
DROBERTS |
Approved |
Entered by DMERANZ1 - |
| 04/11/2023 |
PDSD Engineering Division Pre-Construction SITE |
|
Not Ready |
There has been no change since the last inspection. Construction has halted. |
| 10/03/2023 |
PDSD Engineering Division Pre-Construction SITE |
|
Passed |
project complete and occupied |