Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 03/18/2019 |
ENGR Engineering Final
|
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 03/18/2019 |
ENGR Engineering Final
|
DROBERTS |
Approved |
Entered by CBELL1 - |
| 03/15/2019 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by CBELL1 - Complete notes from 3-14-2019
Engineering is OK with TCO |
| 03/14/2019 |
ENGR Engineering Final
|
RLEDONNE |
Partial Approval |
Entered by CBELL1 - OK per engineer ring only for stocking and training. Walks site with GC went over all corrections. Repair ramp going to lot to the north cross slopes over 2%. Install long-term bicycle parking. Complete all landscaping per approved plans. Provide CERT letter from engineer of record for all grading and drainage on site per approved plans |
| 04/02/2019 |
ENGR Engineering Final
|
RLEDONNE |
Approved |
Entered by CBELL1 - |
| 03/18/2019 |
ENGR Engineering Final
|
DROBERTS |
Partial Approval |
Entered by DROBERT5 - complete all of it is shown on the screen panels installed also I want to show me proof complete all landscaping is shown on the print plans call for final inspection |
| 03/14/2019 |
ENGR Engineering Final
|
RLEDONNE |
Partial Approval |
Entered by CBELL1 - Complete notes for engineering final for grading final. |