Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP18-0166
Inspection Description - ENGR Grading Final
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/01/2019 | ENGR Grading Final | BBENEDON | Approved | Entered by CBELL1 - Trash enclosure apron. |
| 03/21/2019 | ENGR Grading Final | BBENEDON | Approved | Entered by CBELL1 - Trash enclosure is OK for concrete |
| 03/15/2019 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by CBELL1 - Trash closure footing is OK for concrete. Half of the site has been paved and curbs have been poured. Note depressed landscaped areas shall be 6 inches below the inlet of the curb openings at final inspection. |
| 07/18/2019 | ENGR Grading Final | BBENEDON | Approved | Entered by VFLORES1 - |
| 11/16/2018 | ENGR Grading Final | bbenedo1 | Continued | Entered by BBENEDO1 - Contractor not on site, I left a card and inspection form reqesting inspections for storm water. Basin cut along west side of lot. Contractor installing building pad. |
| 07/19/2019 | ENGR Grading Final | BBENEDON | Approved | Entered by VFLORES1 - |
| 08/02/2019 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
| 07/18/2019 | ENGR Grading Final | BBENEDON | Denied | Entered by VFLORES1 - Water harvesting plan on page 12, line item number eight, requires 6 inches depth in all water harvesting locations. I spoke with Mike with Chestnut about this three times prior to any landscaping being installed, however the water harvesting areas have only been depressed roughly 1 to 2 inches below bottom of curb openings, and roughly 3 inches below top of curb where there is no curb opening. Mike said that he installed the grading as directed by his engineer. |
| 05/01/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by CBELL1 - Contractor is installing curbs. |
| 04/03/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by CBELL1 - The site grading appears to be complete. Riprap has been installed along the basin. Superintendent not on site at this time to see the plans. |
| 03/21/2019 | ENGR Grading Final | BBENEDON | Not ready for Inspection | Entered by CBELL1 - Mike from Chestnut is not on site however I spoke with him over the telephone and gave him a heads up about the water harvesting and grading requirements. But I have not seen the plan documents |
| 03/15/2019 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by CBELL1 - Trash closure footing is OK for concrete. Half of the site has been paved and curbs have been poured. Note depressed landscaped areas shall be 6 inches below the inlet of the curb openings at final inspection. |
| 11/19/2018 | ENGR Grading Final | BBENEDON | Continued | Entered by CBELL1 - Contractor installing utilities |
| 11/16/2018 | ENGR Grading Final | bbenedo1 | Continued | Entered by BBENEDO1 - Contractor not on site, I left a card and inspection form reqesting inspections for storm water. Basin cut along west side of lot. Contractor installing building pad. |