Permit: DP18-0166

Parcel: 14029200A

Inspection Status: Passed

Inspection History: ENGR Engineering Final

Permit Number - DP18-0166

Inspection Description - ENGR Engineering Final

Inspection Status - Passed

Date Description Inspector Results Comments
08/02/2019 ENGR Engineering Final DROBERTS Approved Entered by DROBERT5 -
07/25/2019 ENGR Engineering Final RLEDONNE Not ready for Inspection Entered by DMERANZ1 - Complete notes from engineering final.
07/19/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by VFLORES1 - Water harvesting areas one through four are not installed as shown on page 12 note number eight. 6 inches of depth is required below the bottom of the curb not opening. 6 inches below the top of curb is required where there is no opening. Please correct and install per plan. Provide a letter from your engineer of record dated after the correction has been made certifying grade conformance as specified and not 36 page 5. Install splash blocks That rain leaders. Install holes for dumpster door pegs in the open position.
07/18/2019 ENGR Engineering Final BBENEDON Denied Entered by VFLORES1 - Water harvesting plan on page 12, line item number eight, requires 6 inches depth in all water harvesting locations. I spoke with Mike with Chestnut about this three times prior to any landscaping being installed, however the water harvesting areas have only been depressed roughly 1 to 2 inches below bottom of curb openings, and roughly 3 inches below top of curb where there is no curb opening. Mike said that he installed the grading as directed by his engineer.
08/02/2019 ENGR Engineering Final DROBERTS Approved Entered by DROBERT5 -
07/25/2019 ENGR Engineering Final RLEDONNE Not ready for Inspection Entered by DMERANZ1 - Provide CERT letter from engineer of record for all grading and drainage per approved plans. From previous notes.
07/19/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by VFLORES1 - Water harvesting areas one through four are not installed as shown on page 12 note number eight. 6 inches of depth is required below the bottom of the curb not opening. 6 inches below the top of curb is required where there is no opening. Please correct and install per plan. Provide a letter from your engineer of record dated after the correction has been made certifying grade conformance as specified and not 36 page 5. Install splash blocks That rain leaders. Install holes for dumpster door pegs in the open position.