| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/19/2019 | PDSD Site/Engineering Division - Landscaping | BBENEDON | Approved | Entered by VFLORES1 - |
| 07/18/2019 | PDSD Site/Engineering Division - Landscaping | BBENEDON | Denied | Entered by VFLORES1 - Water harvesting plan on page 12, line item number eight, requires 6 inches depth in all water harvesting locations. I spoke with Mike with Chestnut about this three times prior to any landscaping being installed, however the water harvesting areas have only been depressed roughly 1 to 2 inches below bottom of curb openings, and roughly 3 inches below top of curb where there is no curb opening. Mike said that he installed the grading as directed by his engineer. |
| 05/01/2019 | PDSD Site/Engineering Division - Landscaping | BBENEDON | Not ready for Inspection | Entered by CBELL1 - I reminded Mike with Chestnut that dirt needs to be removed so that the landscape areas are 6 inches depressed, below curb openings. |
| 04/03/2019 | PDSD Site/Engineering Division - Landscaping | BBENEDON | Not ready for Inspection | Entered by CBELL1 - I did inform Mike with Chestnut that recessed drainage areas of Shall be 6 inches below curb openings. |
| 03/21/2019 | PDSD Site/Engineering Division - Landscaping | BBENEDON | Not ready for Inspection | Entered by CBELL1 - I spoke with Mike the GC from Chestnut about water harvesting areas and the requirement for those areas to be measured from the curb opening not the top of the curb |
| 07/25/2019 | PDSD Site/Engineering Division - Landscaping | RLEDONNE | Approved | Entered by DMERANZ1 - |
| 07/19/2019 | PDSD Site/Engineering Division - Landscaping | BBENEDON | Not ready for Inspection | Entered by VFLORES1 - Water harvesting areas one through four are not installed as shown on page 12 note number eight. 6 inches of depth is required below the bottom of the curb not opening. 6 inches below the top of curb is required where there is no opening. Please correct and install per plan. Provide a letter from your engineer of record dated after the correction has been made certifying grade conformance as specified and not 36 page 5. Install splash blocks That rain leaders. Install holes for dumpster door pegs in the open position. |
| 07/18/2019 | PDSD Site/Engineering Division - Landscaping | BBENEDON | Denied | Entered by VFLORES1 - Water harvesting plan on page 12, line item number eight, requires 6 inches depth in all water harvesting locations. I spoke with Mike with Chestnut about this three times prior to any landscaping being installed, however the water harvesting areas have only been depressed roughly 1 to 2 inches below bottom of curb openings, and roughly 3 inches below top of curb where there is no curb opening. Mike said that he installed the grading as directed by his engineer. |