Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP18-0156
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/06/2020 | ENGR Grading Final | BBENEDON | Approved | Entered by DMERANZ1 - |
01/06/2020 | ENGR Grading Final | BBENEDON | Approved | Entered by DMERANZ1 - |
09/20/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by VFLORES1 - Temporary fencing along the south east perimeter‘s have been removed |
11/20/2018 | ENGR Grading Final | BBENEDON | Continued | Entered by CBELL1 - Met with Kevin from Eagle Rock at 481-9204. Post your site address. Post your Swip information. Provide a set of City approved plans for inspection. Recall for pre-construction meeting inspection and stormwater controls inspection. Waddle has been installed around the perimeter. Clearing will start next week. |
12/02/2019 | ENGR Grading Final | BBENEDON | Approved | Entered by DMERANZ1 - |
11/26/2019 | ENGR Grading Final | IVR USER | Cancelled | Entered by IVR USER - IVRS - RI canceled |
11/21/2019 | ENGR Grading Final | BBENEDON | Not ready for Inspection | Entered by DMERANZ1 - Contractor is preparing loading dock for concrete. Not ready due to rain event. |
09/17/2019 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by DMERANZ1 - Trash enclosure footings. |
09/05/2019 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by DMERANZ1 - Monument sign footing per plan detail, Provide sign permit with dimensions off of property line or curb. |
09/04/2019 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by DMERANZ1 - Second of three trash enclosure aprons |
09/03/2019 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by DMERANZ1 - Trash enclosure slab and apron requires number four rebar 12 inches on center |
12/17/2019 | ENGR Grading Final | Passed | {Activity date: 12/17/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 12/16/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Rick is on site only until 3 PM} ; {Activity date: 12/04/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by SFLORES2 - Working on final grade along the north side} ; {Activity date: 11/21/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Contractor is preparing loading dock for concrete. Not ready due to rain event.} ; {Activity date: 11/20/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Working on final grade that’s the east side retention basin} ; {Activity date: 11/14/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Sections of the concrete sidewalk have been removed and piled in the retention basin. The repair at the grade discrepancy that south west corner is being made.} ; {Activity date: 11/04/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Grading basin bottom.} ; {Activity date: 10/23/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - There is an obvious elevation discrepancy at the south west entrance. Contractors are installing an automatic gate on the north side between existing facility and the new building.} ; {Activity date: 10/16/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 10/15/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Trash enclosure gates installed} ; {Activity date: 10/14/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - I walked the sidewalks and parking areas with the general contractor and identified the areas that require correction.} ; {Activity date: 10/11/2019; Status: Denied; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Cross slope that four of the seven accessible parking spaces require correction as well as several locations of concrete sidewalk.} ; {Activity date: 10/10/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Site shut down for the day.} ; {Activity date: 10/09/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Final grades been completed. Landscaper installing. Temporary fencing.} ; {Activity date: 10/04/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Paving At the south entrance. Electrical utility work at the north west corner. Right of way work along the south and east perimeter} ; {Activity date: 10/02/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Form for monument sign. Contractor installing paving and rip rap at front water harvesting area} ; {Activity date: 09/24/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Contactor still has some open trenching for electrical utility. Temporary fencing has been taken down} ; {Activity date: 09/20/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by VFLORES1 - Concrete forms for trash enclosures. Final grade is ready for asphalt. } ; {Activity date: 09/19/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by VFLORES1 - Sandy is looking for a sewer inspection, I told him to schedule that under his combination building permit. } ; {Activity date: 09/17/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Trash enclosure footings.} ; {Activity date: 09/11/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Final grading} ; {Activity date: 09/10/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Check the riprap. Continuing to work on final grade.} ; {Activity date: 09/09/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Contractor installing curbs and final grade} ; {Activity date: 09/09/2019; Status: Partial Approval; Inspector: Hthrall; Comment: Entered by HTHRALL1 - SIGN PERMIT APPROVED - T19OT00865 - 9/9/19. LOW-PROFILE SIGN IS SETBACK 25.4' FROM FACEOF STREET CURB, ON SITE. NO FURTHER INSPECTIONS NEEDED FOR SITE WALL. SIGN COUNTS AS 1 SIGN ALLOWED PER STREET FRONT, WITHIN I-1 ALLOWANCES - SIGN AREA/HEIGHT/SETBACK/NUMBER OF SIGNS. NON ILLUM METAL LETTERS TO BE ATTACHED. (COOK & COMPANY SIGNMAKERS CAN CONDUCT A SELF-CERT INSPECTION DUE TO CONSTRUCTION) H.THRALL (SIGNS DIVISION)} ; {Activity date: 09/06/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Continuing to work on final grade.} ; {Activity date: 09/05/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Monument sign footing per plan detail, Provide sign permit with dimensions off of property line or curb.} ; {Activity date: 09/04/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Second of three trash enclosure aprons} ; {Activity date: 08/30/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Eaglerock is installing main sewer line. General contractor has left the site.} ; {Activity date: 08/28/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Eaglerock is installing sewer utility and preparing parking areas for final grade} ; {Activity date: 08/27/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Contractor is installing riprap at front basin and preparing parking lot for asphalt} ; {Activity date: 08/26/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Grading and backfill.} ; {Activity date: 08/23/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Contractor is grading and backfilling utilities.} ; {Activity date: 08/21/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - continue final grading. Installing site utilities.} ; {Activity date: 08/20/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Contractors installing final grade. I talk to Sandy about water harvesting requirements.} ; {Activity date: 08/19/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Contractor is installing final grade.} ; {Activity date: 08/16/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Final grade, curbs and truck ramps are being installed} ; {Activity date: 08/14/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Contractor is doing work in the right of way. Contractor is also starting final grading and curbs. SandyThe general contractor is not on site at 2 PM. There are trades working, there are three open entrances to the site} ; {Activity date: 07/24/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Ramp walls at loading docks OK} ; {Activity date: 07/19/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by VFLORES1 - Backfilling over storm tech system} ; {Activity date: 07/18/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by VFLORES1 - Eaglerock is installing the last of the rock over the storm tech basin Remove the wood spreaders from the bottom of the concrete forms for the ramp dividing walls at the loading dock Brian} ; {Activity date: 07/17/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Storm tech sub ground basin north east corner of building. As shown per plan} ; {Activity date: 07/16/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Storm tech basin along the north side of the building is almost complete. Ramp walls on loading dock side of building, south in progress.} ; {Activity date: 07/11/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Unscheduled inspection requested by |