Inspection History Details
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP18-0156
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/06/2020 | SITE - Stormwater Follow-up | BBENEDON | Approved | Entered by DMERANZ1 - |
12/05/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by DMERANZ1 - No issues |
12/04/2019 | SITE - Stormwater Follow-up | MRAMBER | Continued | Entered by SFLORES2 - Controls are still in place. |
12/03/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by DMERANZ1 - Controls are still in place. |
11/22/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by DMERANZ1 - No issues or concerns in this time. Controls are still in place |
11/14/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by DMERANZ1 - No issues. |
11/04/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by DMERANZ1 - |
10/23/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by DMERANZ1 - Controls are still in place. |
10/10/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by DMERANZ1 - Controls are still in place |
10/09/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by DMERANZ1 - Construction materials and debris on sidewalk |
10/02/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by DMERANZ1 - Streets have been swept |
09/24/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by DMERANZ1 - Muddy track out into driveway and streets due to recent rains. |
09/20/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by VFLORES1 - Minor track out no issues at this time |
09/10/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by DMERANZ1 - Streets are dusty but have been swept. |
08/26/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by DMERANZ1 - No tracked out from this job site on to public streets, however there is mud in private driveway west side. Of site to be cleaned. |
08/23/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by DMERANZ1 - Protections have been installed at drainage structures. |
08/21/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by DMERANZ1 - I spoke with Tricon, doing city of Tucson work in the right of way, and requested the tape protect the drainage structure from dirt contamination. The contractor said he would. Sandy will place controls at the drainage structure inlets as a precaution |
08/19/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by DMERANZ1 - Tricon is performing work in the street. My only concern is preventing dirt from entering drainage structure. |
08/14/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by DMERANZ1 - There is track out in the private driveway to the west. Brosuis to the east is closed |
07/17/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by DMERANZ1 - No issues at this time. |
07/09/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by DMERANZ1 - I’ll track out has been cleaned up, and garbage has been cleaned from the site. |
07/08/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by DMERANZ1 - Some track out rock in the street. Stacy will have his labor sweep site entrances |
07/05/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by VFLORES1 - A new entrance at the northeast corner has been installed and track out protection is in place. |
07/02/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by DMERANZ1 - Minor track out at the north west entrance and some rocks in the street at the southeast entrance. Stacy will take care of it. |
06/24/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by DMERANZ1 - Notable rocks tracked out into street. |
06/20/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by DMERANZ1 - Newly Installed catch basins have not been protected and have dirt in them that need to be removed. Protect all newly installed drainage systems during construction |
06/17/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by DMERANZ1 - There is track out at the same entrance and the SWPPP sign has fallen down |
05/28/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by CBELL1 - There are no concerns at this time |
05/21/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by DMERANZ1 - Contractor will make the corrections in the morning. |
05/20/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by DMERANZ1 - Corrections still required and south end of site. |
05/16/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by DMERANZ1 - I reminded Sandy to sweep up the track out rock that is in the street and to correct the waddle that has fallen into the street. |
05/14/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by DMERANZ1 - Minor track |
04/04/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by CBELL1 - There is some minor track out and rocks to be noted. I spoke with GC Sandy and reminded him to call for engineering inspections periodically and to keep Wattles in place as needed |
02/21/2019 | SITE - Stormwater Follow-up | bbenedo1 | Continued | Entered by BBENEDO1 - There are no issues at this time, however the requested corrections have not been made. unscheduled inspection. |
02/14/2019 | SITE - Stormwater Follow-up | bbenedo1 | Denied | Entered by BBENEDO1 - Corrections to controls on sw corner have not been made as promised. |
02/13/2019 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by CBELL1 - I met with the new GC Sandy. We talked about the waddle along the south and west sides of the site that need repair where they have been moved or disturbed. Note a 2 foot overlap is required for waddle placement. There are no track out issues to be noted at this time |
02/11/2019 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by DROBERT5 - NO CONCERNS ON THIS SITE AT THIS TIME. |
12/04/2018 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by CBELL1 - No issues at this time. |