Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
Permit Number - DP18-0145
Inspection Description - ENGR Engineering Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/10/2019 | ENGR Engineering Final | RLEDONNE | Approved | Entered by RLEDONN1 - |
02/08/2019 | ENGR Engineering Final | DROBERTS | Partial Approval | Entered by CBELL1 - I have advised the crew too open the footer so that it is wider in the area above the existing building footer and along side the side of the footer so additional strength can be obtained. They will be adding additional rebar in the footer to compensate. |
02/04/2019 | ENGR Engineering Final | RLEDONNE | Continued | Entered by CBELL1 - rebar format OK for trashing closure |
01/15/2019 | ENGR Engineering Final | RLEDONNE | Continued | Entered by CBELL1 - Trash enclosure footer for wall okay only. |
10/29/2018 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by CBELL1 - Install trash enclosure / approved plan detail |