Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP18-0139
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/24/2019 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Approved | Entered by DMERANZ1 - |
03/12/2019 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Continued | Entered by CBELL1 - I met with Dan from BFL contractors. We discussed stormwater requirements, concrete containment, and harvesting areas to be installed, also trash enclosure requirements. I suggested that he get a copy of his development package permit. We walked the site and looked at stormwater controls and have no current concerns at this time. Note there is flooding on the private street to the south not due to site construction. |
03/11/2019 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Not ready for Inspection | Entered by CBELL1 - This was an unscheduled inspection, I stop by the site met the superintendent with DFL his name is Dan I showed him his DP number on his plans approved by Alexander Hines and I requested that he schedule 09050 preconstruction meeting. |