Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP18-0139
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/03/2019 | ENGR Grading Final | BBENEDON | Approved | Entered by CBELL1 - Trashing enclosure. |
07/24/2019 | ENGR Grading Final | BBENEDON | Approved | Entered by DMERANZ1 - |
07/24/2019 | ENGR Grading Final | BBENEDON | Approved | Entered by DMERANZ1 - |
07/24/2019 | ENGR Grading Final | BBENEDON | Approved | Entered by DMERANZ1 - |
06/14/2019 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by DMERANZ1 - The new accessible ramp on the east side of the building is less than 8% slope. Contractor is installing paving and the handrail required at the accessible walkway passing the basin due to change of sidewalk location. |
06/03/2019 | ENGR Grading Final | DROBERTS | Continued | Entered by DMERANZ1 - THE INSPECTION WAS SCHEDULED TO VERIFY THE NEED FOR A SAFETY BARRIER FOR THE SIDEWALK BETWEEN VALENCIA AND THE PROPERTY IN THE AREA OF THE DRAINAGE CHANNEL. |
05/31/2019 | ENGR Grading Final | DROBERTS | Continued | Entered by DMERANZ1 - THE CONTRACTOR IS WORKING ON FINE GRADING THE FINISH DIRT GRADE AND INSTALLING THE IRRIGATION SYSTEM FOR THE LANDSCAPING. WE WALKED THE SITE AND LOOKED AT VARIOUS ASPECTS THAT MAY NEED MORE ATTENTION BEFORE MY NEXT SITE VISIT. I HAVE ASKED THEM TO RESCHEDULE THIS INSPECTION FOR NEXT WEEK SO WE CAN DISCUSS THE PEDESTRIAN ACCESS FROM VALENCIA AND THROUGH THE SITE. |
05/10/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by VFLORES1 - contractor is preparing site grading and installing curbs. Inspection meeting to determine barrier requirements. It is determined that no barrier is required per code between the accessible sidewalk and the existing basin. |
05/02/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by CBELL1 - Grading for accessible parking and sidewalk in progress. |
04/26/2019 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by CBELL1 - Trashing closure slab is OK for concrete |
04/18/2019 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by CBELL1 - Trash enclosure |
04/18/2019 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by CBELL1 - Trash enclosure |
04/03/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by CBELL1 - Trash enclosure footing and holes for bollards OK for concrete |
03/12/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by CBELL1 - The site has been Graded down about a foot below existing exterior grade. The contractor is working on the building pad. |