Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
| Date |
Description |
Inspector |
Results |
Comments |
| 07/17/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 05/10/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by VFLORES1 - Contractor has begun installing curbs, and has removed track of protection for final grading. |
| 05/02/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by CBELL1 - No issues at this time, no track out present. Protections in place |
| 04/26/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by CBELL1 - Minor track out onto private road noted. |
| 04/18/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by CBELL1 - There are no issues or concerns at this time |
| 04/03/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by CBELL1 - There are no concerns at this time |
| 03/21/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by CBELL1 - There are no issues at this time. Note the mud in the streets is accumulation from a low spot in the private road not from the job site |
| 03/11/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by CBELL1 - there are no concerns at this time |
| 03/12/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by CBELL1 - Even with the recent rains there are no issues or concerns at this time |