Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP18-0138
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/10/2019 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Approved | Entered by CBELL1 - |
01/23/2019 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Partial Approval | Entered by CBELL1 - Left open for information purposes. Met with Mark at 309-9502 and Joseph at 269-0239 and Yolima @ 289-1572. There is no swift shown on plan. There are controls in place. Call for engineering inspections for your trash enclosure and your sign footings also stormwater follow up inspections. We discussed water harvesting areas. Thank you Brian |