Inspection History Details
Inspection Status: Not Ready
Inspection History: SITE - Stormwater Final Inspection
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | SITE - Stormwater Final Inspection | Not Ready | ||
| 05/22/2024 | SITE - Stormwater Final Inspection | Complete (Recurring) | No concerns with the stormwater as of yet | |
| 06/06/2024 | SITE - Stormwater Final Inspection | Not Ready | ||
| 06/25/2024 | SITE - Stormwater Final Inspection | Partial Pass | Standing Water has been noted in the Southeast basin for more than 12 hours and will need to be addressed by the Engineer of Record. | |
| 07/23/2024 | SITE - Stormwater Final Inspection | Not Ready | contractor has not addressed the issue with the basin on the north east side where it connects to the channel. Contractor continues to work on the basin on the south east side. |
|
| 08/21/2024 | SITE - Stormwater Final Inspection | Complete (Recurring) | No concerns at this time | |
| 10/03/2024 | SITE - Stormwater Final Inspection | Passed |