Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: COT - ENGR - Signage Final
Permit Number - DP18-0124
Inspection Description - COT - ENGR - Signage Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/24/2019 | COT - ENGR - Signage Final | BBENEDON | Approved | Entered by DMERANZ1 - |
10/21/2019 | COT - ENGR - Signage Final | BBENEDON | Not ready for Inspection | Entered by DMERANZ1 - Correct slope on accessible path from street and install new accessible path to existing buildings as shown. Correct the grading at the north west corner of the parking lot. The landscaped area shall be lower than the curb cut. Remove excess dirt and debris from landscape areas prior to installing Dg. Terminate SWPPP if applicable. Schedule shell and building final inspections with the DP permit when you are ready for a temporary certificate. |