Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP18-0124
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/28/2019 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Approved | Entered by DMERANZ1 - |
06/13/2019 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Not ready for Inspection | Entered by DMERANZ1 - I spoke with Ed with Epstein and asked him to provide his NOI and install the required SWPPP signage. I informed him that he will need to install controls as needed to contain his side and that he is responsible for cleaning any dirt that makes it offsite. I asked him to call for preconstruction meeting, and to schedule stormwater inspections biweekly. |
05/17/2019 | PDSD Engineering Division Pre-Construction SITE | DROBERTS | Approved | Entered by CBELL1 - |