Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 10/28/2019 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 06/13/2019 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - I spoke with Ed with Epstein and asked him to provide his NOI and install the required SWPPP signage. I informed him that he will need to install controls as needed to contain his side and that he is responsible for cleaning any dirt that makes it offsite. I asked him to call for preconstruction meeting, and to schedule stormwater inspections biweekly. |
| 05/17/2019 |
PDSD Engineering Division Pre-Construction SITE |
DROBERTS |
Approved |
Entered by CBELL1 - |