Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
| Date |
Description |
Inspector |
Results |
Comments |
| 10/21/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 10/04/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Denied |
Entered by DMERANZ1 - Controls protecting existing catch basin have been compromised and there is visible dirt inside of the existing catch basin for this site. I informed Ed with Epstein construction that he will need to clean the catch basin. |
| 06/13/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by DMERANZ1 - Only concern is keeping dirt off of River Road. |