Permit: DP18-0119

Parcel: 14111024C


Addresses:

8000 S RITA RD

Inspection Status: Not Ready

Inspection History: ENGR Grading Final

Date Description Inspector Results Comments
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
07/18/2019 ENGR Grading Final RLEDONNE Approved Entered by VFLORES1 -
07/09/2019 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - Rebar mat for trash enclosure installed per approved plans.
06/28/2019 ENGR Grading Final RLEDONNE Partial Approval Entered by DMERANZ1 - Vertical rebar in trashing closure wall OK.
06/20/2019 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - rebar four footer for trashing closure and bollards installed per plan.
11/24/2020 ENGR Grading Final RLADONNE Continued Entered by PAHUMAD1 - Continue. No grading activity on site at this time.
09/22/2020 ENGR Grading Final RLEDONNE Continued Entered by JSCHNEI2 - Continue. No grading activity at this time.
08/31/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue. No grading activity at this time.
07/14/2020 ENGR Grading Final RLEDONNE Continued Entered by JSCHNEI2 - Continue. No grading activity on this site at this time.
06/17/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue. No grading activity on site
06/04/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue. No grading activity on site at this time.
05/27/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue. No grading activity on site at this time.
05/04/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - No grading activity at this time.
02/05/2020 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - No grading activity at this time.
10/16/2019 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - No grading activity on site at this time.
10/04/2019 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - Walk site with GC went over redline drawings still need to be approved by city of Tucson for landscaping. Stabilization partially done. Provide stormwater control book for site inspections.
06/25/2019 ENGR Grading Final RLEDONNE Partial Approval Entered by DMERANZ1 - Walked site with general contractor went over work to complete for TCO.
06/06/2019 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - Met with general contractor on site went over plans for what work needs to be done for TCO for building one. And gave out hand out for trash enclosure.
05/28/2019 ENGR Grading Final BBENEDON Continued Entered by CBELL1 - Contractor is starting to install curbs.
01/23/2019 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO GRADING ACTIVITY ON SITE.
12/28/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - THE CONTRACTOR IS WORKING ON PHASE 1 FOR THIS SITE AND WILL BE STARTING THE INSTALLATION OF THE METAL STRUCTURES IN THE NEXT 2 WEEKS.
10/08/2018 ENGR Grading Final BBENEDON Continued Entered by VFLORES1 - Contractor is over Excavating site at this time and Performing grading
05/08/2023 ENGR Grading Final Partial Pass Dave Roberts will reinspect
05/08/2023 ENGR Grading Final Partial Pass Dave Roberts will reinspect