Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 06/18/2019 |
ENGR Grading Final |
RLEDONNE |
Approved |
Entered by RLEDONN1 - |
| 06/18/2019 |
ENGR Grading Final |
RLEDONNE |
Approved |
Entered by RLEDONN1 - |
| 05/02/2019 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by CBELL1 - |
| 06/18/2019 |
ENGR Grading Final |
RLEDONNE |
Approved |
Entered by RLEDONN1 - |
| 05/02/2019 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by CBELL1 - Met with general contractor on site. First inspection from development package almost done with building and parking area. |
| 06/18/2019 |
ENGR Grading Final |
RLEDONNE |
Approved |
Entered by RLEDONN1 - |
| 05/02/2019 |
ENGR Grading Final |
RLEDONNE |
Not ready for Inspection |
Entered by CBELL1 - Met with general contractor went over accessible ramp from street. Hand railing going up on one side of ramp only no landing at bottom tying into existing sidewalk on top things that are not correct on approved plans. Trash enclosure no development package inspections done concrete in wall up Ballard‘s at 4 inches above slab per approved plansNot 4 feet like standard detail. Did not make curb cuts per approved plan for roof drain drainage over drive-through adding pipe under drive-through not on approved plan got with general contractor about revisions approved by city of Tucson for all changes to approved plans |