Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 08/01/2019 |
ENGR Engineering Final
|
RLEDONNE |
Approved |
Entered by RLEDONN1 - |
| 08/01/2019 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by DMERANZ1 - Provide city of Tucson approved revisions for all changes to grading and drainage. |
| 06/18/2019 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by DMERANZ1 - Complete notes from grading final. |
| 05/22/2019 |
ENGR Engineering Final
|
RLEDONNE |
Partial Approval |
Entered by DMERANZ1 - OK for TCOFor engineering only. Complete all work on approved plans before calling for finals. |
| 05/14/2019 |
ENGR Engineering Final
|
JV |
Prior to Final Inspectn |
Entered by JVWINKL1 - Final as-built drawings required for roof collector drainage system. Before Engineering Final |
| 08/01/2019 |
ENGR Engineering Final
|
RLEDONNE |
Approved |
Entered by RLEDONN1 - |
| 08/01/2019 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by DMERANZ1 - See notes from engineering final. |
| 06/18/2019 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by DMERANZ1 - Provide city approved revisions for Drainage on the east side of building. |
| 05/22/2019 |
ENGR Engineering Final
|
RLEDONNE |
Partial Approval |
Entered by DMERANZ1 - Complete notes from engineering final. |
| 05/02/2019 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by CBELL1 - Address all notes complete all revisions all other work for grading final.List of notes may not be complete. |