Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 11/20/2018 |
ENGR Engineering Final
|
BBENEDON |
Approved |
Entered by CBELL1 - |
| 11/19/2018 |
ENGR Engineering Final
|
bbenedo1 |
Not ready for Inspection |
Entered by BBENEDO1 - Contractor working from man lift.
Construction materials and tools still staged in parking lot. |
| 11/14/2018 |
ENGR Engineering Final
|
BBENEDON |
Partial Approval |
Entered by CBELL1 - The only remaining issue is cleaning up and removing the staging area in the mall parking lot |
| 11/13/2018 |
ENGR Engineering Final
|
BBENEDON |
Partial Approval |
Entered by CBELL1 - inspector has no issues that would prevent a temporary C of o.
Install your van access parking sign. Electrician is using two sissor lifts and a forklift to complete minor finish items.
Job trailer, job toilets, construction materials and temporary fencing need to be removed from the mall parking lot for final approval. |
| 11/09/2018 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by CBELL1 - complete the work, clean up construction debris, remove temporary fencing. Provide City approved construction documents. Reschedule for inspection |