Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP18-0089

Parcel: 129041280


Addresses:

19 N NORRIS AV


Inspection Status: Passed

Inspection History: ENGR Grading Final

Permit Number - DP18-0089

Inspection Description - ENGR Grading Final

Inspection Status - Passed

Date Description Inspector Results Comments
05/04/2021 ENGR Grading Final BBENEDON Approved Entered by VLEON1 - Approved FOR 19 NORRIS - Please final permit if not already. All inspections were approved at time of construction
04/23/2021 ENGR Grading Final BBENEDON Approved Entered by VLEON1 - Approved FOR 19 N NORRIS AV. Please final this permit if not already. All inspections were approved at time of construction.
04/22/2021 ENGR Grading Final BBENEDON Approved Entered by VLEON1 - Approved. Please close this permit as all inspections have been completed and approved.
09/23/2019 ENGR Grading Final BBENEDON Approved Entered by VFLORES1 -
09/23/2019 ENGR Grading Final BBENEDON Approved Entered by VFLORES1 -
09/23/2019 ENGR Grading Final BBENEDON Approved Entered by VFLORES1 -
01/09/2019 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - THIS INSPECTION HAS BEEN SCHEDULED FOR THE BUILDING FOOTERS, HAVE ADVISED GARY THAT WE CAN NOT PERFORM THE INSPECTION, IT HAS TO BE DONE BY ONE OF THE BUILDING INSPECTORS.
01/07/2019 ENGR Grading Final DROBERTS Not ready for Inspection Entered by DROBERT5 - THIS INSPECTION IS NOT READY AT THIS TIME. CURRENTLY THE WORK FOR THIS SITE IS FOR THE BUILDING FOOTER AND NOT FOR THE TRASH ENCLOSURE. HAVE ADVISED THE CONTRACTOR TO RESCHEDULE THIS INSPECTION WHEN THEY ARE SETTING THE REBAR FOR THE TRASH ENCLOSURE. THE CURRENT FOOTER WORK IS TO BE INSPECTED UNDER THE COMBO PERMIT FOR THIS SITE.
09/27/2019 ENGR Grading Final BBENEDON Approved Entered by DMERANZ1 - The general contractor Gary promises to clean the remaining construction debris from the demo which is in the city right of way.
09/23/2019 ENGR Grading Final BBENEDON Not ready for Inspection Entered by VFLORES1 - Gary the general contractor canceled inspections.
09/12/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Contractors doing work in the right of way and also landscaping on site.
09/04/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Met with Keven and Gary general contractor. We looked at the plans and it appears that the water harvesting areas still needTo be enlarged. Gary stated that the property line is 2 feet closer and thanshown. I advised him to begin the depressed area at the property line and taper down to the required depth in the center of the water harvesting infiltration area.
08/22/2019 ENGR Grading Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - Contractor is working on final grade, has not started landscaping.
08/14/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Contractor is preparing parking lot and driveways for asphalt.
07/31/2019 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - Met with GC on site went over parking area.