Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/27/2019 | ENGR Engineering Final | BBENEDON | Approved | Entered by DMERANZ1 - The general contractor Gary promises to clean the remaining construction debris from the demo which is in the city right of way. |
09/23/2019 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by VFLORES1 - Gary the general contractor canceled inspections. |
08/14/2019 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by DMERANZ1 - I went over, with Gary the superintendent, some of the requirements for final approval; including a letter from the engineer of record for the trash enclosure installed without engineering inspections. We also talked about stabilization of all disturb soils |
09/27/2019 | ENGR Engineering Final | BBENEDON | Approved | Entered by DMERANZ1 - The general contractor Gary promises to clean the remaining construction debris from the demo which is in the city right of way. |
09/23/2019 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by VFLORES1 - Gary the general contractor canceled inspections. |
09/03/2019 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by DMERANZ1 - |
08/27/2019 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by DMERANZ1 - Contractor still needs to do final grading for landscape areas. Also striping parking area |