Permit: DP18-0089

Parcel: Unknown


Addresses:

19 N NORRIS AV

Inspection Status: Passed

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
09/27/2019 ENGR Engineering Final BBENEDON Approved Entered by DMERANZ1 - The general contractor Gary promises to clean the remaining construction debris from the demo which is in the city right of way.
09/23/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by VFLORES1 - Gary the general contractor canceled inspections.
08/14/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - I went over, with Gary the superintendent, some of the requirements for final approval; including a letter from the engineer of record for the trash enclosure installed without engineering inspections. We also talked about stabilization of all disturb soils
09/27/2019 ENGR Engineering Final BBENEDON Approved Entered by DMERANZ1 - The general contractor Gary promises to clean the remaining construction debris from the demo which is in the city right of way.
09/23/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by VFLORES1 - Gary the general contractor canceled inspections.
09/03/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by DMERANZ1 -
08/27/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - Contractor still needs to do final grading for landscape areas. Also striping parking area