Inspection Status: Not Ready
Inspection History: PDSD Site/Engineering Division - Landscaping
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
PDSD Site/Engineering Division - Landscaping |
|
Not Ready |
|
| 09/27/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Approved |
Entered by DMERANZ1 - The general contractor Gary promises to clean the remaining construction debris from the demo which is in the city right of way. |
| 09/23/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Not ready for Inspection |
Entered by VFLORES1 - Gary the general contractor canceled inspections. |
| 10/24/2019 |
PDSD Site/Engineering Division - Landscaping |
AHINES |
Prior to Final Inspectn |
Entered by AHINES2 - Inspection item previously approved by BBENEDON on 9/27, but revision to lanscape to accomodate sign. Please request inspection and FINAL following revision review approval. |
| 09/12/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Stake trees per drawing specifications on page 12 |
| 09/04/2019 |
PDSD Site/Engineering Division - Landscaping |
TVALENCIA |
Partial Approval |
Entered by DMERANZ1 - Irrigation tubing has been installed. |
| 09/03/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - |
| 08/22/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Contractor is working on final grade, has not started landscaping. |