Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 03/15/2019 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by CBELL1 - |
| 03/15/2019 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by CBELL1 - |
| 12/05/2018 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by CBELL1 - Work still being performed on North side of building waiting for utility company. Temporary fencing still on site |
| 11/09/2018 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by CBELL1 - installing curbs, carlos |
| 12/05/2018 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by CBELL1 - |
| 10/04/2018 |
ENGR Grading Final |
bbenedo1 |
Continued |
Entered by BBENEDO1 - Contractor is installing utilities and building slab.
Check with COT Right of way about work shown on plan that is outside of the property line and within the right of way. |
| 12/05/2018 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by CBELL1 - |
| 10/31/2018 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by CBELL1 - Number 4 Matt and vertical rebar only. |
| 10/11/2018 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by CBELL1 - exterior sidewalks around building as shown on plan |
| 10/03/2018 |
ENGR Grading Final |
BBENEDON |
Not ready for Inspection |
Entered by CMURPHY1 - Recall for inspection for footing of single trash enclosure when ready. Thanks Brian |