Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP18-0084

Parcel: 11618434A


Addresses:

425 N GRANDE AV


Inspection Status: Passed

Inspection History: ENGR Grading Final

Permit Number - DP18-0084

Inspection Description - ENGR Grading Final

Inspection Status - Passed

Date Description Inspector Results Comments
08/30/2019 ENGR Grading Final BBENEDON Approved Entered by DMERANZ1 -
07/17/2019 ENGR Grading Final BBENEDON Partial Approval Entered by DMERANZ1 - Sidewalk scuppers are ready for concrete.
10/02/2019 ENGR Grading Final BBENEDON Approved Entered by DMERANZ1 -
10/02/2019 ENGR Grading Final BBENEDON Approved Entered by DMERANZ1 -
10/02/2019 ENGR Grading Final BBENEDON Approved Entered by DMERANZ1 -
09/05/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Contractor is performing final site grading. There are piles of material on site.
08/29/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Contractor is delayed on final grading due to muddy conditions.
08/22/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Contractor is working on new clubhouse building. No issues or concerns at this time
07/17/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Contractor is Preparing final grade at east parking area.
06/27/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Construction on going south east portion of the site. There are construction trailers and temporary toilets located in various locations throughout the site.
04/16/2019 ENGR Grading Final BBENEDON Continued Entered by CMURPHY1 - I spoke with Kent the general contractor and I informed him that any new asphalt must comply with accessibility requirements for accessible parking spaces. Contractor will attempt to revise the plans to illuminate some of the unnecessary accessible parking spaces. Contractor was requested to remove dirt and/or debris from parking lot areas.
03/27/2019 ENGR Grading Final BBENEDON Continued Entered by CBELL1 - contractor is working on replacing hydronic water piping