Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP18-0084
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/30/2019 | ENGR Grading Final | BBENEDON | Approved | Entered by DMERANZ1 - |
07/17/2019 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by DMERANZ1 - Sidewalk scuppers are ready for concrete. |
10/02/2019 | ENGR Grading Final | BBENEDON | Approved | Entered by DMERANZ1 - |
10/02/2019 | ENGR Grading Final | BBENEDON | Approved | Entered by DMERANZ1 - |
10/02/2019 | ENGR Grading Final | BBENEDON | Approved | Entered by DMERANZ1 - |
09/05/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by DMERANZ1 - Contractor is performing final site grading. There are piles of material on site. |
08/29/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by DMERANZ1 - Contractor is delayed on final grading due to muddy conditions. |
08/22/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by DMERANZ1 - Contractor is working on new clubhouse building. No issues or concerns at this time |
07/17/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by DMERANZ1 - Contractor is Preparing final grade at east parking area. |
06/27/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by DMERANZ1 - Construction on going south east portion of the site. There are construction trailers and temporary toilets located in various locations throughout the site. |
04/16/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by CMURPHY1 - I spoke with Kent the general contractor and I informed him that any new asphalt must comply with accessibility requirements for accessible parking spaces. Contractor will attempt to revise the plans to illuminate some of the unnecessary accessible parking spaces. Contractor was requested to remove dirt and/or debris from parking lot areas. |
03/27/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by CBELL1 - contractor is working on replacing hydronic water piping |