Inspection Status: Passed
Inspection History: PDSD Site/Engineering Division - Landscaping
| Date |
Description |
Inspector |
Results |
Comments |
| 10/01/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 09/24/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Accessible parking spaces require correction. Grading needs to be corrected at the south end of the first and second parking areas due to flooding. Stabilize the area between the pool and the new playground equipment. Steak the trees properly. |
| 10/02/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 08/29/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Contractor has started landscaping at building entrance. |
| 07/17/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - No landscaping has been installed at this time. I did go over the drawings with the general contractor, 6 inches minimum is required at depressed landscaped areas. Details call for staking. There is a basin, we will need a letter from the engineer certified grade at the end of the project. |
| 03/27/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Not ready for Inspection |
Entered by CBELL1 - I gave Luke a heads up that recessed landscaping areas shall have 6 inches clear space. |