Permit: DP18-0082

Parcel: 136048090

Inspection Status: Passed

Inspection History: SITE - Stormwater Follow-up

Permit Number - DP18-0082

Inspection Description - SITE - Stormwater Follow-up

Inspection Status - Passed

Date Description Inspector Results Comments
02/08/2021 SITE - Stormwater Follow-up DROBERTS Approved Entered by VLEON1 - APPROVED
12/01/2020 SITE - Stormwater Follow-up RLEDONNE Continued Entered by PAHUMAD1 - Continue. No concerns at this time.
11/23/2020 SITE - Stormwater Follow-up RLADONNE Continued Entered by PAHUMAD1 - Continue. Stormwater controls on west side of site still need to be repaired.
11/18/2020 SITE - Stormwater Follow-up RLEDONNE Continued Entered by PAHUMAD1 - Continue. Repairs still need to be made on west side of site.
11/05/2020 SITE - Stormwater Follow-up RLEDONNE Continued Entered by PAHUMAD1 - Continue. Some controls have been placed on south side of site repairs still need to be made on west side of site and clean up.
10/29/2020 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RSALDAT1 - Continue Repairs have not been made no changes since last inspection.
10/22/2020 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RSALDAT1 - Continue. No corrections have been made from last inspection.
09/28/2020 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RSALDAT1 - Continue. No changes from last inspection still need to make repairs.
09/23/2020 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RSALDAT1 - Continue. Talked with Chris grading superintendent for Rio West. Corrections still need to be made on site.no changes from last inspection.
09/01/2020 SITE - Stormwater Follow-up RLEDONNE Continued Entered by JSCHNEI2 - Continue. No change from last inspection corrections still have not been made.
08/24/2020 SITE - Stormwater Follow-up RLEDONNE Continued Entered by JSCHNEI2 - Continue. Superintendent not on site called no answer left message. Concrete on the ground no washer out area. Trash around site need To make repairs to stormwater controls. Had conversation with superintendent about repairs to controls still have not been made. Additional repairs need to be made since conversation.
08/03/2020 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RSALDAT1 - Continue. Correction to stormwater controls still have not been repaired per conversation with GC.
07/29/2020 SITE - Stormwater Follow-up RLEDONNE Continued Entered by JSCHNEI2 - . Continue. Repairs from last inspection have not been made yet.
07/15/2020 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RSALDAT1 - Continue. Corrections from last inspection have not been repaired at this time.
07/07/2020 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RSALDAT1 - Continue. Talk to GC about repairs to stormwater controls he would let his stormwater contractor know he needs to make repairs.
05/18/2020 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RSALDAT1 - No concerns at this time.
05/04/2020 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RSALDAT1 - No concerns at this time.
10/25/2019 SITE - Stormwater Follow-up RLEDONNE Continued Entered by DMERANZ1 - No concerns at this time.
10/10/2019 SITE - Stormwater Follow-up RLEDONNE Continued Entered by DMERANZ1 - No concerns at this time.
08/20/2019 SITE - Stormwater Follow-up RLEDONNE Continued Entered by DMERANZ1 - No concerns at this time.