Inspection History Details
Inspection Status: Not Ready
Inspection History: SITE - Stormwater Setup and Controls
Permit Number - DP18-0081
Inspection Description - SITE - Stormwater Setup and Controls
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | SITE - Stormwater Setup and Controls | Not Ready | ||
05/22/2023 | SITE - Stormwater Setup and Controls | Complete (Recurring) | Inform the contractor to give us a call every two weeks or as needed | |
05/31/2023 | SITE - Stormwater Setup and Controls | Complete (Recurring) | No concerns at this time | |
06/13/2023 | SITE - Stormwater Setup and Controls | Complete (Recurring) | Installing 45 inch SRP pipe the first run is good backfill | |
06/20/2023 | SITE - Stormwater Setup and Controls | Deferred | Contractor installing 36 inch SRP about the center of the project and forming up a manhole from a 40 inch SRP to a 52 inch SRP |