Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Grading Final
Permit Number - DP18-0081
Inspection Description - ENGR Grading Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
04/13/2021 | ENGR Grading Final | MHERNADEZ | Continued | Entered by RSALDAT1 - NA |
11/15/2019 | ENGR Grading Final | RLEDONNE | Continued | Entered by DMERANZ1 - Talked with water truck driver site foreman not on site today hauling dirt. |
01/10/2024 | ENGR Grading Final | Passed | ||
06/07/2023 | ENGR Grading Final | Complete (Recurring) | Contractor informed me that they’re gonna start excavating for storm drain pipe on Monday will call in for an inspection on Monday | |
06/12/2023 | ENGR Grading Final | Complete (Recurring) | Mortal land install a 48 inch storm drain pipe on the north east part of the project. | |
06/22/2023 | ENGR Grading Final | Complete (Recurring) | Contractor is forming up a storm drain manhole on the north east side of the project. And installing 24 inch SRP’s on the east going west 160 lineal feet. | |
06/27/2023 | ENGR Grading Final | Complete (Recurring) | contractor is forming for manhole for 32” storm drainage.will pour it later today | |
06/27/2023 | ENGR Grading Final | Complete (Recurring) | contractor is forming for manhole for 32” storm drainage.will pour it later today | |
11/15/2023 | ENGR Grading Final | Partial Pass | Borderland continue to cut grade for sidewalk and ramps superintendent informed me that he would give me a call when the ramps are formed. | |
11/21/2023 | ENGR Grading Final | Partial Pass |