Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 04/06/2022 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 04/27/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by VLEON1 - Continued. Note, Inspector recommends approving this expired permit as all inspections have been approved. |
| 07/10/2020 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by RSALDAT1 - IS APPROVED AT THIS TIME |
| 02/25/2020 |
ENGR Grading Final |
DROBERTS |
Continued |
Entered by DROBERT5 - |
| 11/27/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by DMERANZ1 - Chris with AF Sterling. Please call for inspections under your development package permit. Use code 09150. And please call Dave Roberts. Project is well underway work has been completed without inspection |
| 07/09/2020 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by RSALDAT1 - Approved |
| 07/06/2020 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by JSCHNEI2 - Continued. Contractor is preparing asphalt for resurfacing and restriping |
| 05/26/2020 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued. Corrections at Northeast access have been corrected. Sidewalks between the north two buildings have been checked.
Bicycle parking has been installed. Grouted riprap splash blocks have been stalled. Contractor has all physical separation between construction and occupied sections of the complex. There are unprotected open forms with no caution tape or barricades of any sort. |
| 05/26/2020 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued. Desert earth is excavating in preparation for below ground basin.
|
| 05/18/2020 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued. Will revisit site later this week |
| 04/23/2020 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - Rob with F Sterling is looking to open for more buildings. He will reschedule inspection for Friday once the construction area has been properly secured and separated from use areas.
Sidewalks at Northgate are still out of compliance. Bicycle parking has been installed in one location. Landscaped areas at sidewalk scuppers still need to be depressed to allow for drainage.
|
| 02/25/2020 |
ENGR Grading Final |
DROBERTS |
Continued |
Entered by DROBERT5 - |
| 07/10/2020 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by RSALDAT1 - IS APPROVED AT THIS TIME |
| 02/25/2020 |
ENGR Grading Final |
DROBERTS |
Continued |
Entered by DROBERT5 - |
| 07/10/2020 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by RSALDAT1 - IS APPROVED AT THIS TIME |
| 02/25/2020 |
ENGR Grading Final |
DROBERTS |
Continued |
Entered by DROBERT5 - |