Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
Permit Number - DP18-0067
Inspection Description - ENGR Engineering Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/18/2022 | ENGR Engineering Final | DROBERTS | Approved | Entered by NGARCIA3 - IS APPROVED 314 E 6TH ST |
02/18/2022 | ENGR Engineering Final | DROBERTS | Approved | Entered by NGARCIA3 - IS APPROVED 340 E 6TH ST |
02/16/2022 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by NGARCIA3 - Not ready. Provide contact information for Inspection. Provide City approved civil drawings, bicycle parking as shown and N0T, forSWPPP permit. Schedule all 20 inspection codes from development package permit. 314 E 6TH ST |
02/16/2022 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by NGARCIA3 - Not ready. Provide contact information for Inspection. Provide City approved civil drawings, bicycle parking as shown, N0T, forSWPPP permit. Schedule all 20 inspection codes from development package permit. 340 E 6TH ST |
02/18/2022 | ENGR Engineering Final | DROBERTS | Approved | Entered by NGARCIA3 - IS APPROVED 340 E 6TH ST |
02/18/2022 | ENGR Engineering Final | DROBERTS | Approved | Entered by NGARCIA3 - APPROVED 314 E 6TH ST |