Permit: DP18-0060

Parcel: 99999999A


Addresses:

8525 E 22ND ST


Inspection Status: Not Ready

Inspection History: ENGR Grading Final

Permit Number - DP18-0060

Inspection Description - ENGR Grading Final

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/27/2022 ENGR Grading Final Not Ready
11/12/2020 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
11/12/2020 ENGR Grading Final DROBERTS Partial Approval Entered by DROBERT5 - COMPLETE ALL WORK AND INSPECTIONS ON DP18-0060 AND SCHEDULE FOR ALL FINAL INSPECTIONS AND FULL RELEASES.
11/02/2020 ENGR Grading Final RDELONNE Continued Entered by PAHUMAD1 - Continue no grading activity at this time. Working on houses.
10/23/2020 ENGR Grading Final DROBERTS Continued Entered by RSALDAT1 - CONTINUED AT THIS TIME. SEVEN HOUSES REMAIN UNDER CONSTRUCTION AT THE TIME OF THIS INSPECTION. THESE ARE THE LOCATIONS THAT HAVE CONSTRUCTION TRASH, DEBRIS, AND MINOR STOCKPILES OF CONSTRUCTION MATERIALS. ONCE THE AREAS HAVE BEEN CLEARED AND THE STREETS HAVE BEEN CLEANED THIS SITE CAN BE SCHEDULED FOR A FULL RELEASE OF THE ASSURANCES AND THE CLOSING OF THE DEVELOPMENT PACKAGE.
09/22/2020 ENGR Grading Final RLEDONNE Continued Entered by JSCHNEI2 - Continue. No grading activity at this time.
09/03/2020 ENGR Grading Final RLEDONNE Continued Entered by JSCHNEI2 - Continue. No grading activity at this time.
08/14/2020 ENGR Grading Final RLEDONNE Continued Entered by JSCHNEI2 - Continue. No grading activity at this time all work is being done on houses.
06/15/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue. No grading activity at this time working on houses.
06/04/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue. No grading activity at this time working on houses and house pads.
05/26/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue. No grading activity at this time. Working on houses.
05/12/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - No grading activity at this time.
01/09/2020 ENGR Grading Final DROBERTS Continued Entered by DMERANZ1 - NO CONCERNS AT THIS TIME, VERTICAL WORK CONTINUES ON THE HOMES THROUGHOUT THE SITE.
10/14/2019 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - No grading activity at this time.
08/15/2019 ENGR Grading Final BBENDON Continued Entered by DMERANZ1 - Lance. Post address. Paving in progress
03/15/2019 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - GRADING WORK HAS STARTED ON SITE.
11/12/2020 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
11/12/2020 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
06/13/2019 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - Working on site waterlines. And rough grading.
03/27/2019 ENGR Grading Final DROBERTS Partial Approval Entered by DROBERT5 - I STOPPED BY THE SITE TO SEE WHAT TYPE OF WOK IS HAPPENING. THE UTILITY WORK(TRENCHES) HAD BEEN CUT ON THE PREVIOUS JOB, I WILL BE ASKINNG FOR LETTER FROM THE ENGINEER OF RECORD STATING WHAT HAD BEEN TO RECTIFY THE PREVIOUS WORK. THE CREWS ARE WORKING ON GRADING OF THE SITE FOR THE NEW PAD GRADES, AND WILL BE INSTALLING THE UTILITIES AT A LATER DATE.
11/12/2020 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
08/30/2019 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - Sidewalk scupper at basin rebar mat complete. On Public street.
08/28/2019 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - Working on rebar for scupper off of Street.
08/23/2019 ENGR Grading Final RLEDONNE Partial Approval Entered by DMERANZ1 - Headwall in the center of the site. Floor only. Wer on South West Side of siteFloor only.
10/31/2023 ENGR Grading Final Passed Grade and Plat completed.
Basin looks Great, no concerns.

Ready for finial