| 12/01/2020 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by PAHUMAD1 - Continue. No concerns at this time. |
| 11/23/2020 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by PAHUMAD1 - Continue. No concerns at this time. |
| 11/18/2020 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by PAHUMAD1 - Continue. No concerns at this time.
|
| 11/12/2020 |
SITE - Stormwater Follow-up
|
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 11/12/2020 |
SITE - Stormwater Follow-up
|
DROBERTS |
Continued |
Entered by DROBERT5 - NO CONCERNS AT THIS TIME, GENERAL CLEANUP REQUIRED PRIOT TO SCHEDULING FINALS |
| 11/09/2020 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by PAHUMAD1 - Continue. No track out no concerns at this time. |
| 10/28/2020 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by PAHUMAD1 - Continue. No concerns at this time.
|
| 10/23/2020 |
SITE - Stormwater Follow-up
|
DROBERTS |
Continued |
Entered by RSALDAT1 - CONTINUED AT THIS TIME, THERE ARE NO CONCERNS AT THIS TIME. SOME GENERAL CLEANUP OF THE SITE IS NEEDED IN THE AREAS WHERE HOUSING CONSTRUCTION IS ON GOING. |
| 10/20/2020 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by PAHUMAD1 - Continue. No concerns at this time. |
| 10/02/2020 |
SITE - Stormwater Follow-up
|
DROBERTS |
Continued |
Entered by JSCHNEI2 - CONTINUED, THERE ARE NO STORMWATER CONCERNS AT THIS TIME |
| 09/29/2020 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by JSCHNEI2 - Continue. No concerns at this time.
|
| 09/11/2020 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by JSCHNEI2 - Continue. No concerns at this time. |
| 08/20/2020 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RSALDAT1 - Continue. Repair controls at sidewalk scuppers to keep silt from going into basin. Clean up all trash on and around site.
|
| 08/07/2020 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RSALDAT1 - Continue. No concerns at this time. |
| 08/04/2020 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RSALDAT1 - Continue. No concerns at this time. |
| 07/27/2020 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by JSCHNEI2 - Continue. No concerns at this time. |
| 07/15/2020 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by JSCHNEI2 - Continue. No concerns at this time.
|
| 07/09/2020 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RSALDAT1 - Continue. No concerns at this time. |
| 06/25/2020 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RSALDAT1 - Continue. No concerns at this time. |
| 05/12/2020 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RSALDAT1 - No concerns at this time. |
| 02/18/2020 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by DMERANZ1 - Minor repairs needed to controls went over with KB homes . |
| 01/13/2020 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by DMERANZ1 - Walk site with Lance from KB homes. Stormwater controls look good. Went over work to complete for common areas and landscaping. |
| 12/09/2019 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by DMERANZ1 - No concerns at this time. |
| 11/12/2019 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by DMERANZ1 - No concerns at this time. |
| 10/25/2019 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by DMERANZ1 - Walk site with KB homes went over corrections. |
| 09/24/2019 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by DMERANZ1 - GC not able to make meeting due to rain. control still need to be added. |
| 09/03/2019 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by DMERANZ1 - Walk site with Lance for KB homes went over corrections that need to be made on East and Center site. |
| 08/15/2019 |
SITE - Stormwater Follow-up
|
BBENDON |
Continued |
Entered by DMERANZ1 - No issues. |
| 07/31/2019 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by DMERANZ1 - Walked site with Russell with KB homes. Make repairs to Eastside of sight for Stormwater controlled. Provide wash out for concrete trucks. Pick up trash around site. |
| 07/24/2019 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by DMERANZ1 - No track OutRock on either entrance. Still doing concrete washout with out washout area. Made phone call to Russell WoodmanWith KB homes.
|
| 07/20/2019 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by VFLORES1 - Walk site with Russell from KB homes. Talked about adding concrete washout. And providing notes from engineer of record for RCP installed on north east corner of lot. |
| 07/08/2019 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by DMERANZ1 - Concrete washout still has not been cleaned on south side of property. |
| 07/01/2019 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by DMERANZ1 - Repairs have been made to controls around site for notes from last inspection. Washout needed on site small amount of concrete on southside of Site. |
| 06/19/2019 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by DMERANZ1 - Walk site with homebuilders KB homes went over corrections on south east corner south west corner and north east corner repair corrections call back for inspection. |
| 05/30/2019 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by DMERANZ1 - Walked site corrections need to be made called Lance from KB Holmes went over corrections that need to be made and call me back in two weeks.
|