Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/09/2020 |
ENGR Engineering Final
|
BBENEDON |
Approved |
Entered by JSCHNEI2 - Approved. |
| 09/22/2020 |
ENGR Engineering Final
|
DROBERTS |
Continued |
Entered by RSALDAT1 - IS CONTINUED ON THIS SITE AT THIS TIME. THIS INSPECTION WILL BE SCHEDULED AT A LATER DATE SO THAT ALL THE SIDEWALKS CAN BE VERIFIED FOR BEING ADA COMPLIANT. |
| 08/11/2020 |
ENGR Engineering Final
|
DROBERTS |
Partial Approval |
Entered by JSCHNEI2 - GRADING FINAL IS PARTIAL AT THIS TIME, SEE PREVIOUS COMMENTS. PROVIDE ALL CLOSEOUT DOCUMENTATION PRIOR TO SCHEDULING THIS INSPECTION AGAIN, APPROVED REVISED DRAWINGS, NOTIFICATION OF TERMINATION LETTER FROM ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY, CERTIFICATION LETTER FROM THE ENGINEER OF RECORD. |
| 07/17/2020 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by RSALDAT1 - Not ready. Complete the remaining work. Clean up the site. Provide notice of termination. |
| 08/21/2019 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Mike with Habitat for Humanity requested a walk-through inspection to address any potential problems. All homes are still under construction. Parking lot and basin has been graded, and paved. Correct the bollards and handrail as required per plan.
I suggest consulting with the project engineer regarding the potential for flooding in the right of way/alley. |
| 02/04/2019 |
ENGR Engineering Final
|
bbenedo1 |
Denied |
Entered by BBENEDO1 - NO INSPECTIONS HAVE BEEN SCHEDULED |
| 09/07/2018 |
ENGR Engineering Final
|
DROBERTS |
Partial Approval |
Entered by RCAMACH1 - LOOKED OVER THE SITE AND MET WITH REPRESENTATIVES FROM HABITAT FOR HUMANITY AND ADVISED THEM THAT I WILL NEED TO MAKE SURE ADDITIONAL INSPECTIONS ARE SCHEDULED IN THE FUTURE.
CURRENTLY THEY HAVE COMPLETED THE INSTALLATIKON OF THE ROADWAY, CURBS AND MOST OF THE SIDEWALK WITHOUT ANY INSPECTIONS OF THE SITE. THESE AREAS WILL NEED A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD PRIOR TO THE FINAL ACCEPTANCE OF THE SITE.
THE SITE WORK IS MOSTLY COMPLETED IN THE ROUGH STAGE AT THIS TIME, AND THE DEVELOPER IS CURRENTLY STARTING THE WORK ON THE FIRST 6 HOME SOUTH OF YAVAPAI ROAD. ALL OF THE UTILITIES HAS BEEN IBSPECTED BY THE COT/PDSD BUT THIS WILL HAVE TO BE VERIFIED PEIOR TO THE FINAL ACCEPTANCE OF THIS SITE.
I DID LOOK AT THE REBAR FOR THE DRAINAGE STRUCTURE LOCATED ON THE EAST SIDE OF THE SUBDIVISION ROADWAY FOR THE UPPER SECTION OF THE POUR, THIS WILLL BE POURED NEXT WEEK. |
| 10/09/2020 |
ENGR Engineering Final
|
BBENEDON |
Approved |
Entered by JSCHNEI2 - Approved. |
| 10/08/2020 |
ENGR Engineering Final
|
BBENEDON |
Partial Approval |
Entered by JSCHNEI2 - Partially approved. Minor cleanup needed
And terminate SWPPP
|
| 07/17/2020 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by RSALDAT1 - Not ready. Complete the remaining work. Clean up the site. Provide notice of termination. |
| 07/06/2020 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by JSCHNEI2 - Not ready. Construction materials and storage con exes in Street and parking spaces. Landscaping not complete. Re-call for inspection after cleanup and completion of all work. Terminate SWP. Schedule all remaining inspections on development package permit. |
| 12/18/2019 |
ENGR Engineering Final
|
BBENEDON |
Partial Approval |
Entered by DMERANZ1 - Guard rail has been corrected and is as shown on plan. |
| 08/21/2019 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Mike with Habitat for Humanity requested a walk-through inspection to address any potential problems. All homes are still under construction. Parking lot and basin has been graded, and paved. Correct the bollards and handrail as required per plan.
I suggest consulting with the project engineer regarding the potential for flooding in the right of way/alley. |