Inspection Status: Passed
Inspection History: PDSD Site/Engineering Division - Landscaping
| Date |
Description |
Inspector |
Results |
Comments |
| 07/08/2020 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Approved |
Entered by JSCHNEI2 - Approved |
| 12/18/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - No landscaping has been installed as of yet. |
| 08/21/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Mike with Habitat for Humanity requested a walk-through inspection to address any potential problems. All homes are still under construction. Parking lot and basin has been graded, and paved. Correct the bollards and handrail as required per plan.
I suggest consulting with the project engineer regarding the potential for flooding in the right of way/alley. |
| 06/27/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Rip rap slope has no filter fabric or concrete, and is also too steep. |
| 02/04/2019 |
PDSD Site/Engineering Division - Landscaping |
bbenedo1 |
Not ready for Inspection |
Entered by BBENEDO1 - NONE AT THIS TIME |
| 10/08/2020 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Approved |
Entered by JSCHNEI2 - Approved |
| 09/21/2020 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Partial Approval |
Entered by RSALDAT1 - Partially approved. Complete ground coverings |
| 08/06/2020 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Partial Approval |
Entered by RSALDAT1 - Partially approved. Plants and trees installed |
| 07/20/2020 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Not ready for Inspection |
Entered by JSCHNEI2 - Not ready. Contractor still has work in front to finish |
| 07/17/2020 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Not ready for Inspection |
Entered by RSALDAT1 - Not ready. Complete the remaining work. Clean up the site. Provide notice of termination. |
| 08/21/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Mike with Habitat for Humanity requested a walk-through inspection to address any potential problems. All homes are still under construction. Parking lot and basin has been graded, and paved. Correct the bollards and handrail as required per plan.
I suggest consulting with the project engineer regarding the potential for flooding in the right of way/alley. |