Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 11/06/2020 |
ENGR Engineering Final
|
DROBERTS |
Approved |
Entered by RSALDAT1 - IS APPROVED AT THIS TIME |
| 11/06/2020 |
ENGR Engineering Final
|
DROBERTS |
Partial Approval |
Entered by RSALDAT1 - IS PARTIAL AT THIS TIME, THE LANDSCAPE CREWIS WORKING TO COMPLETE THE PLACEMENT OF DG AND TREE STAKES FOR THIS SITE BY THE END OF TODAY. THE CONTRACTOR WILL SEND ME PICTURES AT THE END OF THE DAY IF ALL OF THE WORK IS COMPLETED AND DP CAN BE CLOSED OUT. |
| 11/03/2020 |
ENGR Engineering Final
|
RDELONNE |
Partial Approval |
Entered by PAHUMAD1 - Partial approval. Grades for landscaping OK per engineer of record no need for water harvesting. Per conversation with Dave Roberts. |
| 10/27/2020 |
ENGR Engineering Final
|
RLEDONNE |
Partial Approval |
Entered by RSALDAT1 - Partial approval. OK for TCO only stocking only. Complete all work on approved plans for final approval. |
| 10/23/2020 |
ENGR Engineering Final
|
DROBERTS |
Continued |
Entered by RSALDAT1 - CONTINUED AT THIS TIME, SITE INSPECTION ONLY TO LOOK AT ISSUES WITH THE DRAINAGE ON THE EAST SIDE OF ROSEMONT. I HAVE ADVISED KEVIN TO CONTACT HIS ENGINEER OF RECORD KEVIN HALL AND DISCUSS WHAT CAN BE DONE WITH THE WATER HARVESTING BASIN IN THIS AREA. THEY WILL LET US KNIW WHAT IS NEEDED AND REQUIRED, IF CHANGES ARE MADE AN APPROVED REVISION FOR THE AREA WILL BE REQUIRED PRIOR TO FINAL APPROVAL.
|