Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP18-0008
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/17/2019 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Approved | Entered by DMERANZ1 - |
| 08/22/2019 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Denied | Entered by DMERANZ1 - The job trailer is locked. Superintendent is not on site and has not followed any of the requirements discussed at the previously scheduled preconstruction meeting. No signage is posted no other controls have been installed. |
| 05/23/2019 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Partial Approval | Entered by DMERANZ1 - Jobsite superintendent is Joe at 928-254-1797. Developer SKW contractors 623-332-2330. General contractor SKW contractors LLC. Subcontractor for grading outlaw excavating 520-343-4043. Engineer Alta 398-6651 extension 201. Cypress development Kevin Hall 499-2456. Post your address and SWPPP signage as required. Call in for biweekly inspections of stormwater follow up 09154. Trash enclosure detail 601 provided, Use 9181 to schedule that inspection. Provide city approved plans with the latest revision. 34 inch basin around three sides of the property has been cut. A letter of final grade will be required at project completion. 6 inch thick shot Crete with wire shown for south slope of basin at a 1 to 1 slope, call for intermediate inspection at time of installation. |