Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP18-0008

Parcel: 10706083A


Addresses:

910 W GLENN ST


Inspection Status: Passed

Inspection History: PDSD Engineering Division Pre-Construction SITE

Permit Number - DP18-0008

Inspection Description - PDSD Engineering Division Pre-Construction SITE

Inspection Status - Passed

Date Description Inspector Results Comments
09/17/2019 PDSD Engineering Division Pre-Construction SITE BBENEDON Approved Entered by DMERANZ1 -
08/22/2019 PDSD Engineering Division Pre-Construction SITE BBENEDON Denied Entered by DMERANZ1 - The job trailer is locked. Superintendent is not on site and has not followed any of the requirements discussed at the previously scheduled preconstruction meeting. No signage is posted no other controls have been installed.
05/23/2019 PDSD Engineering Division Pre-Construction SITE BBENEDON Partial Approval Entered by DMERANZ1 - Jobsite superintendent is Joe at 928-254-1797. Developer SKW contractors 623-332-2330. General contractor SKW contractors LLC. Subcontractor for grading outlaw excavating 520-343-4043. Engineer Alta 398-6651 extension 201. Cypress development Kevin Hall 499-2456. Post your address and SWPPP signage as required. Call in for biweekly inspections of stormwater follow up 09154. Trash enclosure detail 601 provided, Use 9181 to schedule that inspection. Provide city approved plans with the latest revision. 34 inch basin around three sides of the property has been cut. A letter of final grade will be required at project completion. 6 inch thick shot Crete with wire shown for south slope of basin at a 1 to 1 slope, call for intermediate inspection at time of installation.