Permit: DP18-0008

Parcel: 10706083A


Addresses:

910 W GLENN ST


Inspection Status: Passed

Inspection History: ENGR Grading Final

Permit Number - DP18-0008

Inspection Description - ENGR Grading Final

Inspection Status - Passed

Date Description Inspector Results Comments
01/06/2020 ENGR Grading Final BBENEDON Approved Entered by DMERANZ1 -
10/10/2019 ENGR Grading Final BBENEDON Partial Approval Entered by DMERANZ1 - PREVIOUSLY APPROVED REOPENED FOR REINSPECTION
10/15/2019 ENGR Grading Final BBENEDON Partial Approval Entered by DMERANZ1 - Trash enclosure slab.
10/08/2019 ENGR Grading Final BBENEDON Partial Approval Entered by DMERANZ1 - Trash enclosure pre-grout to 4 feet with bond beam OK.
09/27/2019 ENGR Grading Final BBENEDON Partial Approval Entered by DMERANZ1 - Trash enclosure footings. 7 foot bollards on site.
02/12/2020 ENGR Grading Final BBENEDON Approved Entered by DMERANZ1 -
12/12/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 -
01/08/2020 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Minor track out noted on Glen due to work in the right of way.
12/04/2019 ENGR Grading Final BBENEDON Continued Entered by SFLORES2 - Contractors Preparing for asphalt
11/07/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Installing underground electric utility
10/15/2019 ENGR Grading Final BBENEDON Partial Approval Entered by DMERANZ1 - Trash enclosure slab.
10/08/2019 ENGR Grading Final BBENEDON Partial Approval Entered by DMERANZ1 - Trash enclosure pre-grout to 4 feet with bond beam OK.
09/17/2019 ENGR Grading Final BBENEDON Partial Approval Entered by DMERANZ1 - Installing shot Crete over wire mesh.
09/10/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Contractor has cut retention basin but has not started shot Crete.
08/22/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Contractor has dug footings for perimeter fencing and is working on the building.
09/17/2019 ENGR Grading Final BBENEDON Approved Entered by DMERANZ1 -
05/23/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Project is well underway, one building has been constructed. There is utility work being performed in the right of way. Joe is aware of his permitting requirements for this work.
12/11/2019 ENGR Grading Final BBENEDON Approved Entered by DMERANZ1 -