Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP18-0008
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/06/2020 | ENGR Grading Final | BBENEDON | Approved | Entered by DMERANZ1 - |
10/10/2019 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by DMERANZ1 - PREVIOUSLY APPROVED REOPENED FOR REINSPECTION |
10/15/2019 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by DMERANZ1 - Trash enclosure slab. |
10/08/2019 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by DMERANZ1 - Trash enclosure pre-grout to 4 feet with bond beam OK. |
09/27/2019 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by DMERANZ1 - Trash enclosure footings. 7 foot bollards on site. |
02/12/2020 | ENGR Grading Final | BBENEDON | Approved | Entered by DMERANZ1 - |
12/12/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by DMERANZ1 - |
01/08/2020 | ENGR Grading Final | BBENEDON | Continued | Entered by DMERANZ1 - Minor track out noted on Glen due to work in the right of way. |
12/04/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by SFLORES2 - Contractors Preparing for asphalt |
11/07/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by DMERANZ1 - Installing underground electric utility |
10/15/2019 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by DMERANZ1 - Trash enclosure slab. |
10/08/2019 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by DMERANZ1 - Trash enclosure pre-grout to 4 feet with bond beam OK. |
09/17/2019 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by DMERANZ1 - Installing shot Crete over wire mesh. |
09/10/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by DMERANZ1 - Contractor has cut retention basin but has not started shot Crete. |
08/22/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by DMERANZ1 - Contractor has dug footings for perimeter fencing and is working on the building. |
09/17/2019 | ENGR Grading Final | BBENEDON | Approved | Entered by DMERANZ1 - |
05/23/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by DMERANZ1 - Project is well underway, one building has been constructed. There is utility work being performed in the right of way. Joe is aware of his permitting requirements for this work. |
12/11/2019 | ENGR Grading Final | BBENEDON | Approved | Entered by DMERANZ1 - |