Permit: DP18-0008

Parcel: 10706083A


Addresses:

910 W GLENN ST


Inspection Status: Passed

Inspection History: ENGR Engineering Final

Permit Number - DP18-0008

Inspection Description - ENGR Engineering Final

Inspection Status - Passed

Date Description Inspector Results Comments
04/16/2020 ENGR Engineering Final DROBERTS Approved Entered by RSALDAT1 -
03/13/2020 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by SFLORES2 - Complete all work shown on your city approved development package plans. Sidewalk scuppers, riprap, ADA parking signs, wheel stops etc. clean dirt from basin. Install basin depth gauges as shown.
02/05/2020 ENGR Engineering Final BBENEDON Continued Entered by DMERANZ1 - Contractor is installing concrete driveways and sidewalks within the right of way and constructing the storage building in the rear.
10/15/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by DMERANZ1 -
06/04/2020 ENGR Engineering Final DROBERTS Approved Entered by DROBERT5 -
06/02/2020 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - Not ready. No change since last inspection
05/14/2020 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - Not ready. Waiting for resolution of roof drain terminals. Unable to reach contractor, Joe. Not on site. Business is open and operational.
04/16/2020 ENGR Engineering Final DROBERTS Partial Approval Entered by RSALDAT1 - IS PARTIAL PENDING THE APPROVAL FOR THE MODIFICATIONS OF THE DRAINS ON THE WEST SIDE OF THE MAIN BUILDING. THE OWNER IS GOING TO CONTACT THE ZONING AND ENGINEERING REVIEWERS TO SEE IF THEY WILL APPROVE THE PROPSED RED LINE CHANGES FOR THE SCUPPER MODIFICATIONS.
03/13/2020 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by SFLORES2 -
02/05/2020 ENGR Engineering Final BBENEDON Continued Entered by DMERANZ1 - Contractor is installing concrete driveways and sidewalks within the right of way and constructing the storage building in the rear.
12/11/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - Parking lot has been prepared for asphalt.